Grouping-Driven Production Scheduling Optimization for Precast Concrete Components

Precast component production is an important part of industrialization in construction. However, in actual production, it often faces problems such as high resource occupation, long production cycles, and high delivery costs caused by unreasonable scheduling arrangements. This study proposes a hybrid multi-objective optimization framework that combines Q-learning with the non-dominated sorting genetic algorithm, termed QL-NSGA-II, to address the highly coupled problem of component grouping on pallets and production scheduling in precast component manufacturing. The model aims to collaboratively minimize the number of pallets used, the makespan, and the penalty cost. The algorithm constructs a dual Q-table Markov decision architecture, in which the agent adaptively coordinates PC component grouping and scheduling strategies based on reward feedback from the evolutionary state. Through extreme-value tests on multiple benchmark instances from the literature, the results show that the proposed QL-NSGA-II not only achieves the accuracy of the benchmark solutions, but also, in some cases, reduces the makespan and penalty cost by 34.77% and 60.24%, respectively, compared with existing benchmark algorithms. In a real industrial order experiment with 87 components, the algorithm notably outperforms the comparison algorithms across comprehensive convergence metrics such as hypervolume and inverted generational distance, confirming its favorable practical application potential for balancing pallet resource consumption and flow cycle.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-11-09
DOI
https://doi.org/10.3390/buildings16214468
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Grouping-Driven Production Scheduling Optimization for Precast Concrete Components

Shicen LIU, Baigang Du, Junyong Liang, Yu Fu et al.
Buildings
Scheduling and Optimization Algorithms
article

Grouping-Driven Production Scheduling Optimization for Precast Concrete Components

Shicen LIU, Baigang Du, Junyong Liang, Yu Fu, Yongzhong Zhang
article en

Abstract

Precast component production is an important part of industrialization in construction. However, in actual production, it often faces problems such as high resource occupation, long production cycles, and high delivery costs caused by unreasonable scheduling arrangements. This study proposes a hybrid multi-objective optimization framework that combines Q-learning with the non-dominated sorting genetic algorithm, termed QL-NSGA-II, to address the highly coupled problem of component grouping on pallets and production scheduling in precast component manufacturing. The model aims to collaboratively minimize the number of pallets used, the makespan, and the penalty cost. The algorithm constructs a dual Q-table Markov decision architecture, in which the agent adaptively coordinates PC component grouping and scheduling strategies based on reward feedback from the evolutionary state. Through extreme-value tests on multiple benchmark instances from the literature, the results show that the proposed QL-NSGA-II not only achieves the accuracy of the benchmark solutions, but also, in some cases, reduces the makespan and penalty cost by 34.77% and 60.24%, respectively, compared with existing benchmark algorithms. In a real industrial order experiment with 87 components, the algorithm notably outperforms the comparison algorithms across comprehensive convergence metrics such as hypervolume and inverted generational distance, confirming its favorable practical application potential for balancing pallet resource consumption and flow cycle.

BuildingsVol. 16(21)
Wuhan University of Technology (CN), Sichuan University of Science and Engineering (CN)
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Grouping-Driven Production Scheduling Optimization for Precast Concrete Components — Shicen LIU, Baigang Du, et al. · Buildings (2026) | TGRS Research Map | TGRS