РАЗВИТИЕ ИНСТИТУЦИОНАЛЬНЫХ ОСНОВ ГОСУДАРСТВЕННО-ЧАСТНОГО ПАРТНЕРСТВА В УСЛОВИЯХ ТРАНСФОРМАЦИИ ЭНЕРГЕТИЧЕСКОЙ ОТРАСЛИ

The paper examines the institutional architecture of public-private partnership (PPP) in the electricity sector of the Republic of Uzbekistan during its market transformation in 2019-2026. The study aims to identify inconsistencies between PPP rules and the emerging institutions of a competitive electricity market and to substantiate ways of resolving them. The methodology draws on new institutional economics, historical-institutional periodization, comparative legal analysis and a matrix of institutional gaps. The reform is shown to have passed through four stages, from establishing basic rules to fiscal ceilings and planned project selection. The project-initiative format ensured a rapid inflow of private capital (solar and wind output rose from 0.43 bn kWh in 2022 to 10.5 bn kWh in 2025) but was accompanied by growing contingent liabilities and limited contract transparency. An approach is proposed that develops the regulatory, organizational and fiscal-contractual contours of PPP in a synchronized way

Authors

Publication Details

Journal
Ilgʻor iqtisodiyot va pedagogik texnologiyalar.
Published
2026-11-09
DOI
https://doi.org/10.60078/3060-4842-2026-vol3-iss5-pp705-716
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

РАЗВИТИЕ ИНСТИТУЦИОНАЛЬНЫХ ОСНОВ ГОСУДАРСТВЕННО-ЧАСТНОГО ПАРТНЕРСТВА В УСЛОВИЯХ ТРАНСФОРМАЦИИ ЭНЕРГЕТИЧЕСКОЙ ОТРАСЛИ

Dildоrа Kurbаnоvа
Ilgʻor iqtisodiyot va pedagogik texnologiyalar.
Public-Private Partnership Projects
article

РАЗВИТИЕ ИНСТИТУЦИОНАЛЬНЫХ ОСНОВ ГОСУДАРСТВЕННО-ЧАСТНОГО ПАРТНЕРСТВА В УСЛОВИЯХ ТРАНСФОРМАЦИИ ЭНЕРГЕТИЧЕСКОЙ ОТРАСЛИ

Dildоrа Kurbаnоvа
article en

Abstract

The paper examines the institutional architecture of public-private partnership (PPP) in the electricity sector of the Republic of Uzbekistan during its market transformation in 2019-2026. The study aims to identify inconsistencies between PPP rules and the emerging institutions of a competitive electricity market and to substantiate ways of resolving them. The methodology draws on new institutional economics, historical-institutional periodization, comparative legal analysis and a matrix of institutional gaps. The reform is shown to have passed through four stages, from establishing basic rules to fiscal ceilings and planned project selection. The project-initiative format ensured a rapid inflow of private capital (solar and wind output rose from 0.43 bn kWh in 2022 to 10.5 bn kWh in 2025) but was accompanied by growing contingent liabilities and limited contract transparency. An approach is proposed that develops the regulatory, organizational and fiscal-contractual contours of PPP in a synchronized way

Ilgʻor iqtisodiyot va pedagogik texnologiyalar.Vol. 3(5)
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon