Private Project Delivery Under Current Procurement Systems in Nigeria

Private construction projects in Nigeria continue to face delays, cost overruns, coordination problems and quality concerns. Procurement systems shape contractual relationships, allocation of responsibilities, communication and project control, and may therefore influence delivery outcomes. This study assessed current procurement systems used in private construction projects in Nigeria, the factors guiding their selection, the challenges associated with implementation, and perceived relationships with cost, time and quality performance. A descriptive survey was conducted among construction professionals in Lagos and Ibadan. Of 143 questionnaires distributed, 105 valid responses were returned, giving a response rate of 73.4%. Stratified and purposive sampling were used. Data were analysed in SPSS using frequencies, percentages, mean scores, rankings and Pearson correlation. Design and Build had the highest reported adoption mean (3.42), followed by Traditional Procurement (3.35) and Negotiated Procurement (3.21); Integrated Project Delivery had the lowest mean (2.16). Availability of project funds (4.29), project complexity (4.28) and project size (4.27) were the strongest reported procurement-selection factors. Project delays (4.20), cost overruns (4.04) and poor coordination (3.95) were prominent challenges. Respondents rated procurement-related scheduling/programme management at 4.15, specification compliance at 4.08 and cost control at 4.03. Overall performance was positively associated with cost (r = 0.253, p = 0.009), time (r = 0.517, p < 0.001) and quality (r = 0.591, p < 0.001). The study concludes that procurement choices should align with project financing, complexity, size and quality requirements, supported by effective planning, contract administration and stakeholder coordination.

Authors

Institutions

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-11-08
DOI
https://doi.org/10.64388/ire1724890
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Private Project Delivery Under Current Procurement Systems in Nigeria

Oluwadare Abraham Awe, Sunday Adefemi Adesogan
1 links
Iconic Research and Engineering Journals
Construction Project Management and Performance
article

Private Project Delivery Under Current Procurement Systems in Nigeria

Oluwadare Abraham Awe, Sunday Adefemi Adesogan
article en

Abstract

Private construction projects in Nigeria continue to face delays, cost overruns, coordination problems and quality concerns. Procurement systems shape contractual relationships, allocation of responsibilities, communication and project control, and may therefore influence delivery outcomes. This study assessed current procurement systems used in private construction projects in Nigeria, the factors guiding their selection, the challenges associated with implementation, and perceived relationships with cost, time and quality performance. A descriptive survey was conducted among construction professionals in Lagos and Ibadan. Of 143 questionnaires distributed, 105 valid responses were returned, giving a response rate of 73.4%. Stratified and purposive sampling were used. Data were analysed in SPSS using frequencies, percentages, mean scores, rankings and Pearson correlation. Design and Build had the highest reported adoption mean (3.42), followed by Traditional Procurement (3.35) and Negotiated Procurement (3.21); Integrated Project Delivery had the lowest mean (2.16). Availability of project funds (4.29), project complexity (4.28) and project size (4.27) were the strongest reported procurement-selection factors. Project delays (4.20), cost overruns (4.04) and poor coordination (3.95) were prominent challenges. Respondents rated procurement-related scheduling/programme management at 4.15, specification compliance at 4.08 and cost control at 4.03. Overall performance was positively associated with cost (r = 0.253, p = 0.009), time (r = 0.517, p < 0.001) and quality (r = 0.591, p < 0.001). The study concludes that procurement choices should align with project financing, complexity, size and quality requirements, supported by effective planning, contract administration and stakeholder coordination.

Iconic Research and Engineering JournalsVol. 10(5)
University of Ibadan (NG)
Peace, justice, and strong institutions
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon