Development of a Maintenance Management Cost-Effectiveness Prediction Model for Ageing Bridge Infrastructure: A Case of TARURA, Tanga Region, Tanzania

Bridges managed by the Tanzania Rural and Urban Roads Agency (TARURA) in Tanga Region are maintained largely reactively. About 78% of the annual bridge maintenance budget of TZS 850 million is spent on emergency repairs that cost 2.5 to 4 times more than equivalent preventive work. Existing bridge prediction models mostly predict condition rather than cost, require long inspection histories or large datasets, and omit institutional factors such as budget adequacy. This study therefore developed a maintenance management cost-effectiveness prediction model for ageing bridges in Tanga Region. It adopted a pragmatic philosophy and a convergent parallel mixed-methods design within a single case study of TARURA Tanga. Data were collected through document review, field observation and a structured questionnaire administered to 80 TARURA staff and contractors selected by stratified random and purposive sampling. Factors were ranked with the Relative Importance Index (RII). A multiple linear regression (MLR) model of annual maintenance cost was then estimated from the records of 80 bridges and benchmarked against a Random Forest. Seven of fourteen candidate factors met the RII threshold of 0.74, led by budget adequacy and allocation methods (0.970) and coastal exposure and corrosion (0.945). On a hold-out test set, the MLR achieved R² = 0.833 and MAPE = 13.0%, outperforming the Random Forest (R² = 0.517, MAPE = 22.5%). Structural age had the largest cost-increasing effect, and treatment selection had the largest cost-reducing effect. Each one-level improvement across all seven factors lowered predicted annual cost by about TZS 2.43 million per bridge. The study concludes that institutional factors drive bridge maintenance cost alongside physical deterioration. It also concludes that a transparent model built on routine inspection data can rank interventions by cost-effectiveness under a fixed budget. It recommends that TARURA Tanga shift funds from emergency to preventive maintenance and prioritise corrosion protection for coastal bridges and axle-load control on agricultural routes. It further recommends standardising inspection records to capture the model inputs and adopting the model as a spreadsheet decision tool until a computerised Bridge Management System is developed.

Authors

Institutions

Publication Details

Journal
East African Journal of Engineering
Published
2026-11-07
DOI
https://doi.org/10.37284/eaje.9.2.6215
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Development of a Maintenance Management Cost-Effectiveness Prediction Model for Ageing Bridge Infrastructure: A Case of TARURA, Tanga Region, Tanzania

Philip Gabriel Mzava, Hajra Habibu
1 links
East African Journal of Engineering
Infrastructure Maintenance and Monitoring
article

Development of a Maintenance Management Cost-Effectiveness Prediction Model for Ageing Bridge Infrastructure: A Case of TARURA, Tanga Region, Tanzania

Philip Gabriel Mzava, Hajra Habibu
article en

Abstract

Bridges managed by the Tanzania Rural and Urban Roads Agency (TARURA) in Tanga Region are maintained largely reactively. About 78% of the annual bridge maintenance budget of TZS 850 million is spent on emergency repairs that cost 2.5 to 4 times more than equivalent preventive work. Existing bridge prediction models mostly predict condition rather than cost, require long inspection histories or large datasets, and omit institutional factors such as budget adequacy. This study therefore developed a maintenance management cost-effectiveness prediction model for ageing bridges in Tanga Region. It adopted a pragmatic philosophy and a convergent parallel mixed-methods design within a single case study of TARURA Tanga. Data were collected through document review, field observation and a structured questionnaire administered to 80 TARURA staff and contractors selected by stratified random and purposive sampling. Factors were ranked with the Relative Importance Index (RII). A multiple linear regression (MLR) model of annual maintenance cost was then estimated from the records of 80 bridges and benchmarked against a Random Forest. Seven of fourteen candidate factors met the RII threshold of 0.74, led by budget adequacy and allocation methods (0.970) and coastal exposure and corrosion (0.945). On a hold-out test set, the MLR achieved R² = 0.833 and MAPE = 13.0%, outperforming the Random Forest (R² = 0.517, MAPE = 22.5%). Structural age had the largest cost-increasing effect, and treatment selection had the largest cost-reducing effect. Each one-level improvement across all seven factors lowered predicted annual cost by about TZS 2.43 million per bridge. The study concludes that institutional factors drive bridge maintenance cost alongside physical deterioration. It also concludes that a transparent model built on routine inspection data can rank interventions by cost-effectiveness under a fixed budget. It recommends that TARURA Tanga shift funds from emergency to preventive maintenance and prioritise corrosion protection for coastal bridges and axle-load control on agricultural routes. It further recommends standardising inspection records to capture the model inputs and adopting the model as a spreadsheet decision tool until a computerised Bridge Management System is developed.

East African Journal of EngineeringVol. 9(2)
Dar es Salaam Institute of Technology (TZ)
Industry, innovation and infrastructure
Openalex Percentile: Top 21%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon