The Effect of Project-Based Learning on the Mathematics Achievement of Fourth-Grade Students in Shaoshan Primary School, Kunming, Yunnan

Background and Aims: The impact of project-based learning (PBL) on mathematics achievement has significant research implications. This learning method emphasizes a project-centered approach to cultivating students' comprehensive abilities and allows them to engage in real-world problem solving. This experimental research aimed to: 1) compare students' mathematics achievement before and after project-based learning; 2) compare mathematics achievement after project-based learning with the predetermined criterion of 70%; and 3) assess students' satisfaction with project-based learning. Methodology: This study employed cluster random sampling to select 30 fourth-grade students (1 class) from a population of 104 students (2 classes) at Shaoshan Primary School in Kunming, Yunnan Province. Data on mathematics achievement and satisfaction were collected through mathematics achievement tests and questionnaires, respectively. SPSS software was used to analyze the collected data, including item difficulty (p), item discrimination (r), reliability, mean, standard deviation, and one-sample t-test. Result: The results showed that 1) mathematics achievement test scores of the students after learning through project-based learning (M = 28.47, SD = 3.56) were higher than those before learning (M = 11.83, SD = 3.50) at the 0.01 significance level; 2) the post-test scores were higher than the predetermined criterion of 70% at the 0.01 significance level (M = 28.47, SD = 3.56); and 3) students' satisfaction was at a high level (M = 4.52, SD = 0.97). The findings indicate that using a 4-step project-based learning approach can effectively improve students' mathematics achievement, stimulate their interest in learning, develop their independent learning ability, and meet their personalized learning needs. Conclusion: According to the research results, we can draw the following conclusions: The average score and standard deviation of fourth-grade students who received project-based learning met the 70% criterion at the 0.05 significance level. Project-based learning can enhance students' mathematics achievement.

Authors

Institutions

Publication Details

Journal
Interdisciplinary Academic and Research Journal
Published
2026-11-06
DOI
https://doi.org/10.60027/iarj.2026.e298204
Primary Topic
Problem and Project Based Learning
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

The Effect of Project-Based Learning on the Mathematics Achievement of Fourth-Grade Students in Shaoshan Primary School, Kunming, Yunnan

马翠, Suwana Juithong, Wassaporn Jirojphan
1 links
Interdisciplinary Academic and Research Journal
Problem and Project Based Learning
article

The Effect of Project-Based Learning on the Mathematics Achievement of Fourth-Grade Students in Shaoshan Primary School, Kunming, Yunnan

马翠, Suwana Juithong, Wassaporn Jirojphan
article en

Abstract

Background and Aims: The impact of project-based learning (PBL) on mathematics achievement has significant research implications. This learning method emphasizes a project-centered approach to cultivating students' comprehensive abilities and allows them to engage in real-world problem solving. This experimental research aimed to: 1) compare students' mathematics achievement before and after project-based learning; 2) compare mathematics achievement after project-based learning with the predetermined criterion of 70%; and 3) assess students' satisfaction with project-based learning. Methodology: This study employed cluster random sampling to select 30 fourth-grade students (1 class) from a population of 104 students (2 classes) at Shaoshan Primary School in Kunming, Yunnan Province. Data on mathematics achievement and satisfaction were collected through mathematics achievement tests and questionnaires, respectively. SPSS software was used to analyze the collected data, including item difficulty (p), item discrimination (r), reliability, mean, standard deviation, and one-sample t-test. Result: The results showed that 1) mathematics achievement test scores of the students after learning through project-based learning (M = 28.47, SD = 3.56) were higher than those before learning (M = 11.83, SD = 3.50) at the 0.01 significance level; 2) the post-test scores were higher than the predetermined criterion of 70% at the 0.01 significance level (M = 28.47, SD = 3.56); and 3) students' satisfaction was at a high level (M = 4.52, SD = 0.97). The findings indicate that using a 4-step project-based learning approach can effectively improve students' mathematics achievement, stimulate their interest in learning, develop their independent learning ability, and meet their personalized learning needs. Conclusion: According to the research results, we can draw the following conclusions: The average score and standard deviation of fourth-grade students who received project-based learning met the 70% criterion at the 0.05 significance level. Project-based learning can enhance students' mathematics achievement.

Interdisciplinary Academic and Research JournalVol. 6(6)
Valaya Alongkorn Rajabhat University (TH)
Quality education
Openalex Percentile: Top 10%
Problem and Project Based Learning
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon