A decade review of Indonesia’s PPP project: stakeholder insights on strategic needs and policy adjustments

Purpose This study examines stakeholder perspectives on institutional governance challenges affecting the implementation of Public-Private Partnerships (PPPs) in Indonesia under Presidential Regulation Number 38 of 2015. It further identifies stakeholder-informed policy reform needs to strengthen the national PPP framework. Design/methodology/approach A qualitative research design was employed using semi-structured interviews with nine high-level purposively selected participants representing government institutions, private sector entities, and financial institutions involved in PPP implementation. Data were analyzed through thematic synthesis involving open coding, category development, and interpretive theme construction. Findings The findings identify four institutional governance dimensions influencing PPP implementation: regulatory adaptability and institutional continuity, project preparation quality, financial structuring and risk allocation, and lifecycle governance. Across stakeholder groups, participants consistently highlighted policy inconsistency, limited feasibility study credibility, rigid contractual arrangements, disproportionate risk allocation, and insufficient operational oversight as priority governance concerns. These findings represent expert-based perspectives rather than a comprehensive assessment of Indonesia's PPP system. Research limitations/implications The study is based on a limited qualitative sample and stakeholder perceptions rather than quantitative project performance data. Future research may adopt mixed methods, longitudinal evaluations, and comparative cross-country approaches. Originality/value This study provides a stakeholder-based institutional governance perspective on the implementation of Indonesia's PPP framework under Presidential Regulation Number 38 of 2015 and proposes an integrated governance framework for policy reform.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-11-06
DOI
https://doi.org/10.1108/ecam-01-2026-0177
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A decade review of Indonesia’s PPP project: stakeholder insights on strategic needs and policy adjustments

Ali Sunandar, Saipol Bari Abd-Karim, Umi Kalsum Zolkafli, Fitri Andriyanti
1 links
Engineering Construction & Architectural Management
Public-Private Partnership Projects
article

A decade review of Indonesia’s PPP project: stakeholder insights on strategic needs and policy adjustments

Ali Sunandar, Saipol Bari Abd-Karim, Umi Kalsum Zolkafli, Fitri Andriyanti
article en

Abstract

Purpose This study examines stakeholder perspectives on institutional governance challenges affecting the implementation of Public-Private Partnerships (PPPs) in Indonesia under Presidential Regulation Number 38 of 2015. It further identifies stakeholder-informed policy reform needs to strengthen the national PPP framework. Design/methodology/approach A qualitative research design was employed using semi-structured interviews with nine high-level purposively selected participants representing government institutions, private sector entities, and financial institutions involved in PPP implementation. Data were analyzed through thematic synthesis involving open coding, category development, and interpretive theme construction. Findings The findings identify four institutional governance dimensions influencing PPP implementation: regulatory adaptability and institutional continuity, project preparation quality, financial structuring and risk allocation, and lifecycle governance. Across stakeholder groups, participants consistently highlighted policy inconsistency, limited feasibility study credibility, rigid contractual arrangements, disproportionate risk allocation, and insufficient operational oversight as priority governance concerns. These findings represent expert-based perspectives rather than a comprehensive assessment of Indonesia's PPP system. Research limitations/implications The study is based on a limited qualitative sample and stakeholder perceptions rather than quantitative project performance data. Future research may adopt mixed methods, longitudinal evaluations, and comparative cross-country approaches. Originality/value This study provides a stakeholder-based institutional governance perspective on the implementation of Indonesia's PPP framework under Presidential Regulation Number 38 of 2015 and proposes an integrated governance framework for policy reform.

Engineering Construction & Architectural Management
Yogyakarta State University (ID), Mercu Buana University (ID), University of Malaya (MY)
Peace, justice, and strong institutions, Industry, innovation and infrastructure
Openalex Percentile: Top 13%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon