Electricity Market Development and the Competitiveness of Industrial Consumers in Bulgaria

Industrial electricity costs depend on more than the day-ahead price. This paper examines how the development of Bulgaria's electricity market since 2004 has changed the position of large industrial consumers. The analysis follows the opening of free-market trading, the subsequent development of balancing, exchange trading and network rules, and the increasing role of regional market integration. It then considers how these changes affect the cost and risk position of industrial firms. Aurubis Bulgaria is used as a longitudinal company case because it participated in the first freely negotiated electricity transaction and, two decades later, is investing in production expansion, energy efficiency, photovoltaic generation, and infrastructure. The Bulgarian experience shows that liberalisation created useful electricity purchasing options but at the same time transferred more responsibility for forecasting, contracting and risk management to firms. Regional integration has increased access to suppliers and resources while making a national day-ahead price advantage less durable. For industrial competitiveness, the practical issue is therefore the quality of market access, cost allocation and risk-management options available to firms over the investment horizon.

Authors

Institutions

Publication Details

Journal
Икономически изследвания
Published
2026-11-06
DOI
https://doi.org/10.56497/esj260806
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Electricity Market Development and the Competitiveness of Industrial Consumers in Bulgaria

Atanas Georgiev
Икономически изследвания
Electric Power System Optimization
article

Electricity Market Development and the Competitiveness of Industrial Consumers in Bulgaria

Atanas Georgiev
article en

Abstract

Industrial electricity costs depend on more than the day-ahead price. This paper examines how the development of Bulgaria's electricity market since 2004 has changed the position of large industrial consumers. The analysis follows the opening of free-market trading, the subsequent development of balancing, exchange trading and network rules, and the increasing role of regional market integration. It then considers how these changes affect the cost and risk position of industrial firms. Aurubis Bulgaria is used as a longitudinal company case because it participated in the first freely negotiated electricity transaction and, two decades later, is investing in production expansion, energy efficiency, photovoltaic generation, and infrastructure. The Bulgarian experience shows that liberalisation created useful electricity purchasing options but at the same time transferred more responsibility for forecasting, contracting and risk management to firms. Regional integration has increased access to suppliers and resources while making a national day-ahead price advantage less durable. For industrial competitiveness, the practical issue is therefore the quality of market access, cost allocation and risk-management options available to firms over the investment horizon.

Икономически изследванияVol. 35(8)
Sofia University "St. Kliment Ohridski" (BG)
Industry, innovation and infrastructure
Openalex Percentile: Top 26%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon