A stratified hybrid model for scenario-weighted causal risk assessment of construction sites

Purpose Interdependent hazards and changing operating conditions complicate construction safety prioritization. This study develops a stratified probabilistic framework to assess these influences jointly and support context-specific decisions. Design/methodology/approach The framework was applied to 36 risk factors across nine dimensions at a large mixed-use construction project in Türkiye under six external states. Fuzzy decision-making trial and evaluation laboratory (DEMATEL) informed network structure, evidential reasoning generated prior distributions, and best–worst method (BWM) importance weights parameterized Bayesian conditional probability tables. State probabilities were elicited from five experts through BWM likelihood comparisons of the six states. Comparative state probabilities were derived from a Markov transition matrix proposed by a large language model, and the final ranking was compared with a BWM-based benchmark. Findings Final risk scores ranged from 0.5125 to 0.7146. The highest priorities were identified as work schedule pressure (0.7146), stock control and planning (0.7001), documentation practices (0.6908), storage and organization (0.6907) and working hours/shifts (0.6889). The final ranking showed high agreement with the comparative Markov-based ranking (Spearman's ρ = 0.994) and moderate agreement with the BWM-based benchmark (ρ = 0.547). Practical implications The findings identify scheduling, material management, documentation and working arrangements as priorities alongside physical hazard controls. Results remain specific to the assessed project and modeling assumptions; independent empirical validation remains necessary. Originality/value The framework links expert-informed risk structuring, probabilistic propagation and scenario-weighted prioritization, with distinct roles for importance weights and probability distributions.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2026-11-06
DOI
https://doi.org/10.1108/ecam-08-2026-1754
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A stratified hybrid model for scenario-weighted causal risk assessment of construction sites

Melih Yücesan
1 links
Engineering Construction & Architectural Management
Occupational Health and Safety Research
article

A stratified hybrid model for scenario-weighted causal risk assessment of construction sites

Melih Yücesan
article en

Abstract

Purpose Interdependent hazards and changing operating conditions complicate construction safety prioritization. This study develops a stratified probabilistic framework to assess these influences jointly and support context-specific decisions. Design/methodology/approach The framework was applied to 36 risk factors across nine dimensions at a large mixed-use construction project in Türkiye under six external states. Fuzzy decision-making trial and evaluation laboratory (DEMATEL) informed network structure, evidential reasoning generated prior distributions, and best–worst method (BWM) importance weights parameterized Bayesian conditional probability tables. State probabilities were elicited from five experts through BWM likelihood comparisons of the six states. Comparative state probabilities were derived from a Markov transition matrix proposed by a large language model, and the final ranking was compared with a BWM-based benchmark. Findings Final risk scores ranged from 0.5125 to 0.7146. The highest priorities were identified as work schedule pressure (0.7146), stock control and planning (0.7001), documentation practices (0.6908), storage and organization (0.6907) and working hours/shifts (0.6889). The final ranking showed high agreement with the comparative Markov-based ranking (Spearman's ρ = 0.994) and moderate agreement with the BWM-based benchmark (ρ = 0.547). Practical implications The findings identify scheduling, material management, documentation and working arrangements as priorities alongside physical hazard controls. Results remain specific to the assessed project and modeling assumptions; independent empirical validation remains necessary. Originality/value The framework links expert-informed risk structuring, probabilistic propagation and scenario-weighted prioritization, with distinct roles for importance weights and probability distributions.

Engineering Construction & Architectural Management
Munzur University (TR)
Sustainable cities and communities
Openalex Percentile: Top 10%
Occupational Health and Safety Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon