Abstract Factory operators face a challenging business environment, necessitating more frequent factory upgrades. State-of-the-art approaches for factory planning include extensive data preparation efforts, accounting for approximately 60% of the total planning effort. Within the last few years, model-based approaches such as building information modelling have significantly improved factory planning efficiency. However, the holistic digital factory models that stand at the end of the factory planning phase are not effectively transferred into the operational phase. They are, therefore, not linked to the digital twin and are not updated during the operation phase. Consequently, these digital factory models become outdated and cannot be used for subsequent factory replanning. Based on a structured literature review and two focus group discussions, this paper proposes a new method for transferring holistic digital factory models into the operations phase and to provide an updated digital factory model at the interface to the next replanning phase. The feasibility of this method is validated at the application scenario of a laboratory for additive multi-material manufacturing with data from energy monitoring and MES.

Authors

Institutions

Publication Details

Journal
Research Square
Published
2026-11-06
DOI
https://doi.org/10.21203/rs.3.rs-11113043/v1
Primary Topic
BIM and Construction Integration
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Method for Digital Information Continuity in the Context of Short-Cycled Factory Replanning

Fabian Bermpohl, Sven Forte, Christian Johannes Eckart, Daub Rüdiger et al.
2 links
Research Square
BIM and Construction Integration
preprint

Method for Digital Information Continuity in the Context of Short-Cycled Factory Replanning

Fabian Bermpohl, Sven Forte, Christian Johannes Eckart, Daub Rüdiger, Anja Munzke
preprint en

Abstract

Abstract Factory operators face a challenging business environment, necessitating more frequent factory upgrades. State-of-the-art approaches for factory planning include extensive data preparation efforts, accounting for approximately 60% of the total planning effort. Within the last few years, model-based approaches such as building information modelling have significantly improved factory planning efficiency. However, the holistic digital factory models that stand at the end of the factory planning phase are not effectively transferred into the operational phase. They are, therefore, not linked to the digital twin and are not updated during the operation phase. Consequently, these digital factory models become outdated and cannot be used for subsequent factory replanning. Based on a structured literature review and two focus group discussions, this paper proposes a new method for transferring holistic digital factory models into the operations phase and to provide an updated digital factory model at the interface to the next replanning phase. The feasibility of this method is validated at the application scenario of a laboratory for additive multi-material manufacturing with data from energy monitoring and MES.

Research Square
Fraunhofer Institute for Casting, Composite and Processing Technology IGCV (DE)
Industry, innovation and infrastructure
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon