Shaft and Gallery Gravity Storage for Mars Settlements

This conceptual white paper evaluates shaft and gallery gravity energy storage as an emergency power reserve for Mars settlements during dust storms and other power shortfalls. Surplus electricity raises locally filled ballast modules, which are parked on fixed supports until needed. A regenerative hoist lowers the modules into an underground rail gallery to power selected critical loads. The concept examines how a settlement could reuse deep industrial excavation while keeping habitat access and emergency egress independent of ballast handling. In the illustrative 500 m reference case, each 50-tonne module delivers 18.11 kWh net after empty return, transfer, and buffer losses. The model requires 40 accessible modules to supply 10 kW for 72 Earth hours. With one kilometre of usable parking track at each elevation, modelled coverage at the same load reaches 12.5 Earth days with a 500 m drop or 25.5 Earth days with a 1,000 m drop. The paper examines hoist throughput, recharge time, and landed equipment mass. It proposes a 90-Earth-day standby test to assess whether the system can restart independently and sustain the critical load.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-06
DOI
https://doi.org/10.5281/zenodo.24002672
Primary Topic
Planetary Science and Exploration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Shaft and Gallery Gravity Storage for Mars Settlements

SAMUEL JAGGARD
1 links
Zenodo (CERN European Organization for Nuclear Research)
Planetary Science and Exploration
article

Shaft and Gallery Gravity Storage for Mars Settlements

SAMUEL JAGGARD
article en

Abstract

This conceptual white paper evaluates shaft and gallery gravity energy storage as an emergency power reserve for Mars settlements during dust storms and other power shortfalls. Surplus electricity raises locally filled ballast modules, which are parked on fixed supports until needed. A regenerative hoist lowers the modules into an underground rail gallery to power selected critical loads. The concept examines how a settlement could reuse deep industrial excavation while keeping habitat access and emergency egress independent of ballast handling. In the illustrative 500 m reference case, each 50-tonne module delivers 18.11 kWh net after empty return, transfer, and buffer losses. The model requires 40 accessible modules to supply 10 kW for 72 Earth hours. With one kilometre of usable parking track at each elevation, modelled coverage at the same load reaches 12.5 Earth days with a 500 m drop or 25.5 Earth days with a 1,000 m drop. The paper examines hoist throughput, recharge time, and landed equipment mass. It proposes a 90-Earth-day standby test to assess whether the system can restart independently and sustain the critical load.

Zenodo (CERN European Organization for Nuclear Research)
Affordable and clean energy, Industry, innovation and infrastructure
Openalex Percentile: Top 16%
Planetary Science and Exploration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon