Financial Feasibility, Modelling and Asset Monetisation in Government & Public Sector Project Development: An Embedded Practice-Based Study at a Big Four Advisory Firm

Most of what we know about capital budgeting comes from studying corporate finance departments. We know far less about the advisory firms that prepare projects for government, even though a large share of India’s infrastructure pipeline passes through their hands. This paper takes a small look inside one of them. I spent my on-the-job training in the Government & Public Sector (G&PS) practice of KPMG’s Indian advisory arm, and I use a work tracker of 33 task-level entries (10 July–24 August 2026), together with sector evidence and fifteen peer-reviewed sources, to ask four questions about how financial analysis is actually done in that setting. The short answer is that a recognisable capital-budgeting pipeline exists (site and demand assessment, then a financial model, then a Detailed Project Report), but public-sector realities bend it: confidentiality, many layers of sign-off, and tender deadlines. I also found that bid and proposal work made up 36% of my logged entries, almost as much as pre-feasibility and modelling (39%). The two are not rivals. They are stages of one chain: win the mandate, do the analysis, protect the commercial terms. I propose a one-page assumption-traceability sheet that ties feasibility findings to model inputs, and I set out a research agenda on how Indian G&PS practices balance advisory and bid work. The evidence comes from one trainee’s vantage point, one tracker and confidential projects, so the findings describe process and pattern, not financial outcomes. Keywords: financial feasibility; financial modelling; capital budgeting; public–private partnership; asset monetisation; National Monetisation Pipeline; government advisory; bid management; Big Four; India

Authors

Publication Details

Journal
International Journal of Creative and Open Research in Engineering and Management
Published
2026-11-06
DOI
https://doi.org/10.55041/ijcope.v2i11.018
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Financial Feasibility, Modelling and Asset Monetisation in Government & Public Sector Project Development: An Embedded Practice-Based Study at a Big Four Advisory Firm

Parth Vinod Wagh, Prof. Meer Mazar Ali
International Journal of Creative and Open Research in Engineering and Management
Public-Private Partnership Projects
article

Financial Feasibility, Modelling and Asset Monetisation in Government & Public Sector Project Development: An Embedded Practice-Based Study at a Big Four Advisory Firm

Parth Vinod Wagh, Prof. Meer Mazar Ali
article en

Abstract

Most of what we know about capital budgeting comes from studying corporate finance departments. We know far less about the advisory firms that prepare projects for government, even though a large share of India’s infrastructure pipeline passes through their hands. This paper takes a small look inside one of them. I spent my on-the-job training in the Government & Public Sector (G&PS) practice of KPMG’s Indian advisory arm, and I use a work tracker of 33 task-level entries (10 July–24 August 2026), together with sector evidence and fifteen peer-reviewed sources, to ask four questions about how financial analysis is actually done in that setting. The short answer is that a recognisable capital-budgeting pipeline exists (site and demand assessment, then a financial model, then a Detailed Project Report), but public-sector realities bend it: confidentiality, many layers of sign-off, and tender deadlines. I also found that bid and proposal work made up 36% of my logged entries, almost as much as pre-feasibility and modelling (39%). The two are not rivals. They are stages of one chain: win the mandate, do the analysis, protect the commercial terms. I propose a one-page assumption-traceability sheet that ties feasibility findings to model inputs, and I set out a research agenda on how Indian G&PS practices balance advisory and bid work. The evidence comes from one trainee’s vantage point, one tracker and confidential projects, so the findings describe process and pattern, not financial outcomes. Keywords: financial feasibility; financial modelling; capital budgeting; public–private partnership; asset monetisation; National Monetisation Pipeline; government advisory; bid management; Big Four; India

International Journal of Creative and Open Research in Engineering and ManagementVol. 02(11)
Openalex Percentile: Top 14%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon