Implementation strategies for warehouse management systems in cold storage: Evidence from phased and big-bang approaches

Background: Warehouse management system (WMS) implementation in cold storage environments presents technical, organisational and human challenges that are amplified by perishability, seasonality, traceability requirements and operational disruption risks. Empirical evidence comparing implementation methodologies in this context remains limited. Objectives: This study compared phased rollout and big-bang WMS implementation methodologies in the Western Cape fruit export sector, focusing on implementation challenges, critical success factors (CSF), post-implementation benefits and long-term support and sustainability. Method: A quantitative survey was administered to 40 respondents directly involved in WMS implementation in cold storage operations in the Western Cape fruit export sector. Respondents were drawn from two companies employing different implementation methodologies: phased rollout (n = 20) and big bang (n = 20). Data were analysed using Cronbach’s alpha, independent-samples t-test, effect sizes (Cohen’s d) and principal component analysis. Results: Phased rollout respondents reported significantly stronger outcomes than big-bang respondents for all CSF and post-implementation benefits, with large effect sizes across all 16 items (Cohen’s d ≥ 0.83). The largest differences were observed for quality of vendor support (d = 2.47), data visibility improvement (d = 2.37), customer service improvement (d = 2.23) and traceability improvement (d = 2.14). Conclusion: Long-term support structures and system utilisation were more developed in the phased rollout organisation, with higher reported levels of internal support, super-user networks, continuous training and use of planned system functionality. Contribution: The study provides sector-specific empirical evidence on WMS implementation in South African cold storage and identifies vendor support, comprehensive testing, training and resource allocation as important differentiators for implementation governance and planning.

Authors

Institutions

Publication Details

Journal
Journal of Transport and Supply Chain Management
Published
2026-11-05
DOI
https://doi.org/10.4102/jtscm.v20i0.1459
Primary Topic
ERP Systems Implementation and Impact
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Implementation strategies for warehouse management systems in cold storage: Evidence from phased and big-bang approaches

Anneke De Bod, Robin Serafino
Journal of Transport and Supply Chain Management
ERP Systems Implementation and Impact
article

Implementation strategies for warehouse management systems in cold storage: Evidence from phased and big-bang approaches

Anneke De Bod, Robin Serafino
article en

Abstract

Background: Warehouse management system (WMS) implementation in cold storage environments presents technical, organisational and human challenges that are amplified by perishability, seasonality, traceability requirements and operational disruption risks. Empirical evidence comparing implementation methodologies in this context remains limited. Objectives: This study compared phased rollout and big-bang WMS implementation methodologies in the Western Cape fruit export sector, focusing on implementation challenges, critical success factors (CSF), post-implementation benefits and long-term support and sustainability. Method: A quantitative survey was administered to 40 respondents directly involved in WMS implementation in cold storage operations in the Western Cape fruit export sector. Respondents were drawn from two companies employing different implementation methodologies: phased rollout (n = 20) and big bang (n = 20). Data were analysed using Cronbach’s alpha, independent-samples t-test, effect sizes (Cohen’s d) and principal component analysis. Results: Phased rollout respondents reported significantly stronger outcomes than big-bang respondents for all CSF and post-implementation benefits, with large effect sizes across all 16 items (Cohen’s d ≥ 0.83). The largest differences were observed for quality of vendor support (d = 2.47), data visibility improvement (d = 2.37), customer service improvement (d = 2.23) and traceability improvement (d = 2.14). Conclusion: Long-term support structures and system utilisation were more developed in the phased rollout organisation, with higher reported levels of internal support, super-user networks, continuous training and use of planned system functionality. Contribution: The study provides sector-specific empirical evidence on WMS implementation in South African cold storage and identifies vendor support, comprehensive testing, training and resource allocation as important differentiators for implementation governance and planning.

Journal of Transport and Supply Chain ManagementVol. 20
Stellenbosch University (ZA)
Openalex Percentile: Top 9%
ERP Systems Implementation and Impact
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon