Integrated Production and Maintenance Scheduling for Energy-Efficient Distributed Flexible Job Shops with Machine Degradation and Limited Maintenance Resources

In distributed flexible job shops, preventive maintenance is required to manage machine degradation, but competition for limited maintenance resources can delay production. This study develops a bi-objective model to minimize makespan and total energy consumption by integrating factory assignment, operation sequencing, machine and processing speed selection, imperfect preventive maintenance, and maintenance resource allocation. To solve this problem, a multi-objective memetic algorithm with constrained maintenance resources (MRC-MOMA) is proposed. The algorithm combines four-layer encoding with a decoder that generates maintenance requests according to machine degradation and schedules them under maintenance resource constraints. Computational experiments show that MRC-MOMA achieves better overall performance than the comparison algorithms in terms of hypervolume (HV) and inverted generational distance (IGD), with sensitivity analysis supporting this advantage within the tested parameter ranges. For the representative instances, increasing maintenance resource capacity substantially reduces maintenance waiting time and shortens makespan, but does not necessarily reduce total energy consumption.

Authors

Institutions

Publication Details

Journal
Algorithms
Published
2026-11-05
DOI
https://doi.org/10.3390/a19110968
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Integrated Production and Maintenance Scheduling for Energy-Efficient Distributed Flexible Job Shops with Machine Degradation and Limited Maintenance Resources

Kaifeng Geng, Li Liu, Liang Shuangjun
Algorithms
Scheduling and Optimization Algorithms
article

Integrated Production and Maintenance Scheduling for Energy-Efficient Distributed Flexible Job Shops with Machine Degradation and Limited Maintenance Resources

Kaifeng Geng, Li Liu, Liang Shuangjun
article en

Abstract

In distributed flexible job shops, preventive maintenance is required to manage machine degradation, but competition for limited maintenance resources can delay production. This study develops a bi-objective model to minimize makespan and total energy consumption by integrating factory assignment, operation sequencing, machine and processing speed selection, imperfect preventive maintenance, and maintenance resource allocation. To solve this problem, a multi-objective memetic algorithm with constrained maintenance resources (MRC-MOMA) is proposed. The algorithm combines four-layer encoding with a decoder that generates maintenance requests according to machine degradation and schedules them under maintenance resource constraints. Computational experiments show that MRC-MOMA achieves better overall performance than the comparison algorithms in terms of hypervolume (HV) and inverted generational distance (IGD), with sensitivity analysis supporting this advantage within the tested parameter ranges. For the representative instances, increasing maintenance resource capacity substantially reduces maintenance waiting time and shortens makespan, but does not necessarily reduce total energy consumption.

AlgorithmsVol. 19(11)
National Research Tomsk State University (RU), Nanyang Institute of Technology (CN)
Openalex Percentile: Top 18%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Integrated Production and Maintenance Scheduling for Energy-Efficient Distributed Flexible Job Shops with Machine Degradation and Limited Maintenance Resources — Kaifeng Geng, Li Liu, et al. · Algorithms (2026) | TGRS Research Map | TGRS