Certified AC Dispatch over Load Sets and in Continuous Time: Verified Feasibility and Optimality Gaps

An optimal power flow dispatch is computed for one forecast load but operated while loads change and automatic generation control absorbs forecast errors. We certify operation over load sets: a parametric Krawczyk test proves a power-flow solution for a dispatch or affine policy, Taylor models prove every limit, and load-affine Lagrangian bounds bound its relative regret by ε, with the bound maximized exactly over the set. Each piece of a ramped schedule under a box of regional forecast errors is such a set. On eight benchmark systems at ε = 1%, a rule interpolating three optimal power flows is certified for ±5% load-level swings at 78% of the test loads on average, against 57% for a secant through them and 44% for participation factors. Under the hourly optimal dispatch, some sampled one-percent regional error violates an operational threshold in 44% of the hours; certificate-designed schedules are certified on 98.0% of the time along the forecast and, with one balancing unit, proven feasible under every such error on 54.0% (none on three systems, at least 98.8% on four). On a modified 2000-bus Texas grid, 98.6% of 1272 hours are certified along the forecast.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-05
DOI
https://doi.org/10.5281/zenodo.23987542
Primary Topic
Electric Power System Optimization
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Certified AC Dispatch over Load Sets and in Continuous Time: Verified Feasibility and Optimality Gaps

Yuan Shen
Zenodo (CERN European Organization for Nuclear Research)
Electric Power System Optimization
preprint

Certified AC Dispatch over Load Sets and in Continuous Time: Verified Feasibility and Optimality Gaps

Yuan Shen
preprint en

Abstract

An optimal power flow dispatch is computed for one forecast load but operated while loads change and automatic generation control absorbs forecast errors. We certify operation over load sets: a parametric Krawczyk test proves a power-flow solution for a dispatch or affine policy, Taylor models prove every limit, and load-affine Lagrangian bounds bound its relative regret by ε, with the bound maximized exactly over the set. Each piece of a ramped schedule under a box of regional forecast errors is such a set. On eight benchmark systems at ε = 1%, a rule interpolating three optimal power flows is certified for ±5% load-level swings at 78% of the test loads on average, against 57% for a secant through them and 44% for participation factors. Under the hourly optimal dispatch, some sampled one-percent regional error violates an operational threshold in 44% of the hours; certificate-designed schedules are certified on 98.0% of the time along the forecast and, with one balancing unit, proven feasible under every such error on 54.0% (none on three systems, at least 98.8% on four). On a modified 2000-bus Texas grid, 98.6% of 1272 hours are certified along the forecast.

Zenodo (CERN European Organization for Nuclear Research)
University of British Columbia, Okanagan Campus (CA)
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Certified AC Dispatch over Load Sets and in Continuous Time: Verified Feasibility and Optimality Gaps — Yuan Shen · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS