An Evidence-Based Risk Governance Framework for Public-Private Partnerships in Saudi Arabia: An Uncertainty-Aware Prioritization Framework

Abstract Saudi Arabia’s expanding use of public–private partnerships (PPPs) requires risk priorities that are locally grounded, uncertainty-aware, and operationally actionable. This study developed an auditable evidence-to-governance approach combining literature normalization, stakeholder assessment, quantitative uncertainty analysis, and qualitative contextualization. A 43-source corpus was classified; a 15-source item archive yielded 519 statements, of which 495 were factor-level, 14 contextual, and 10 non-factor-level. Fourteen recurrence-eligible sources supported normalization into 41 factors and selection of 15 risks for a probability–impact questionnaire completed by 205 Saudi PPP stakeholders. Respondent-level probability–impact products were analyzed using Friedman and Holm-adjusted Wilcoxon tests, participant-vector bootstrap resampling, dominance probabilities, tied-rank literature–market alignment, subgroup tests, and sensitivity scenarios. Political and security instability ranked first (CI = 0.5243; 95% bootstrap confidence interval: 0.4835–0.5647), followed by cost escalation and overrun (CI = 0.5173) and coordination and communication failure (CI = 0.5151). Fourteen risks formed the Tier 1 set, while regulatory and legal uncertainty remained Tier 2. Literature recurrence and market criticality showed positive but non-significant alignment (Spearman’s ρ = 0.400; permutation p = 0.1403). Rankings were stable after excluding straightliners and remained highly correlated across prespecified sensitivity scenarios. Open-ended responses yielded 12 themes, including three emergent candidates, which informed proposed controls and key risk indicators without altering quantitative ranks. The resulting Proposed Evidence-Based Saudi PPP Risk Governance Framework links the full risk register to lifecycle ownership, contractual allocation, response controls, monitoring triggers, escalation, and residual-risk review, providing a transparent basis for project-specific governance.

Authors

Institutions

Publication Details

Journal
Research Square
Published
2026-11-05
DOI
https://doi.org/10.21203/rs.3.rs-11284489/v1
Primary Topic
Public-Private Partnership Projects
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

An Evidence-Based Risk Governance Framework for Public-Private Partnerships in Saudi Arabia: An Uncertainty-Aware Prioritization Framework

Dina M. Mansour, Fikry Abdou Salem, Mohamed Osami Rageh, Musab Hamed ALshammari
Research Square
Public-Private Partnership Projects
preprint

An Evidence-Based Risk Governance Framework for Public-Private Partnerships in Saudi Arabia: An Uncertainty-Aware Prioritization Framework

Dina M. Mansour, Fikry Abdou Salem, Mohamed Osami Rageh, Musab Hamed ALshammari
preprint en

Abstract

Abstract Saudi Arabia’s expanding use of public–private partnerships (PPPs) requires risk priorities that are locally grounded, uncertainty-aware, and operationally actionable. This study developed an auditable evidence-to-governance approach combining literature normalization, stakeholder assessment, quantitative uncertainty analysis, and qualitative contextualization. A 43-source corpus was classified; a 15-source item archive yielded 519 statements, of which 495 were factor-level, 14 contextual, and 10 non-factor-level. Fourteen recurrence-eligible sources supported normalization into 41 factors and selection of 15 risks for a probability–impact questionnaire completed by 205 Saudi PPP stakeholders. Respondent-level probability–impact products were analyzed using Friedman and Holm-adjusted Wilcoxon tests, participant-vector bootstrap resampling, dominance probabilities, tied-rank literature–market alignment, subgroup tests, and sensitivity scenarios. Political and security instability ranked first (CI = 0.5243; 95% bootstrap confidence interval: 0.4835–0.5647), followed by cost escalation and overrun (CI = 0.5173) and coordination and communication failure (CI = 0.5151). Fourteen risks formed the Tier 1 set, while regulatory and legal uncertainty remained Tier 2. Literature recurrence and market criticality showed positive but non-significant alignment (Spearman’s ρ = 0.400; permutation p = 0.1403). Rankings were stable after excluding straightliners and remained highly correlated across prespecified sensitivity scenarios. Open-ended responses yielded 12 themes, including three emergent candidates, which informed proposed controls and key risk indicators without altering quantitative ranks. The resulting Proposed Evidence-Based Saudi PPP Risk Governance Framework links the full risk register to lifecycle ownership, contractual allocation, response controls, monitoring triggers, escalation, and residual-risk review, providing a transparent basis for project-specific governance.

Research Square
Mansoura University (EG), Future University in Egypt (EG)
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon