Upzoning Near Transit: A 2026 Three-Metro VMT Screen for Build or Wait
Takeaway Detail Require peak headway ≤15 minutes for station-area upzoning The 2026 three-metro screen sets a ≤15-minute peak headway gate; avoid weaker proxies Independent technical note mirroring the canonical version: https://urbanplanadvisor.com/blog/upzoning-near-transit-a-2026-three-metro-vmt-screen-for-build-or-wait.php
Authors
- Hadley Sims
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-05
- DOI
- https://doi.org/10.5281/zenodo.23989441
- Primary Topic
- Transportation Planning and Optimization
- Type
- preprint