A Comprehensive Study on Social, Economic, and Environmental Approaches in Rooppur Nuclear Power Plant, Bangladesh

The Rooppur Nuclear Power Plant (RNPP), Bangladesh’s first nuclear power plant, is a major energy-infrastructure project with implications for energy security, economic development, society, and the environment. This study evaluates RNPP through an integrated social, economic, and environmental framework using documentary analysis, published baseline evidence, and illustrative engineering calculations; the household survey and environmental sampling components are presented as planned fieldwork and are not treated as completed results. The documentary analysis confirms that RNPP comprises two VVER-1200 units with a combined electrical capacity of 2,400 MW and that Unit 1 reached the fuel-loading milestone in May 2026. The project also has substantial financial exposure: the original construction contract was approximately US$12.65 billion, while the project cost in Bangladesh taka has subsequently risen because of exchange-rate and project-cost revisions. Environmental calculations indicate that, under the stated assumptions, a cooling-tower configuration would evaporate approximately 0.63 m³/s of water per unit, while a hypothetical once-through system would require about 60 m³/s per unit. Published pre-operational radiological studies around RNPP provide baseline evidence that can support future monitoring. The main potential benefits identified are reliable baseload electricity, reduced exposure to fossil-fuel price volatility, employment and skills development, and technological capacity building. The principal challenges are high capital and financing costs, schedule and implementation risks, radioactive-waste management, water and thermal impacts, emergency preparedness, and the need for sustained public confidence. Overall, the study finds that RNPP’s contribution to Bangladesh’s sustainable development will depend on effective regulation, transparent governance, continuous environmental and radiological monitoring, responsible waste management, and successful commissioning and operation.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-05
DOI
https://doi.org/10.5281/zenodo.23967253
Primary Topic
Environmental and Social Impact Assessments
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A Comprehensive Study on Social, Economic, and Environmental Approaches in Rooppur Nuclear Power Plant, Bangladesh

Md. Shajedul Islam, Mst. Fahmida Yesmin Hafsa, Syeda Sabrina Jannat Mohona, Mst. Tahrima Khatun et al.
Zenodo (CERN European Organization for Nuclear Research)
Environmental and Social Impact Assessments
article

A Comprehensive Study on Social, Economic, and Environmental Approaches in Rooppur Nuclear Power Plant, Bangladesh

Md. Shajedul Islam, Mst. Fahmida Yesmin Hafsa, Syeda Sabrina Jannat Mohona, Mst. Tahrima Khatun, Sidratul Muntaha Lubaba, Most. Sumaya Sultana, Sadia Islam, Md. Mizanur Rahman
article en

Abstract

The Rooppur Nuclear Power Plant (RNPP), Bangladesh’s first nuclear power plant, is a major energy-infrastructure project with implications for energy security, economic development, society, and the environment. This study evaluates RNPP through an integrated social, economic, and environmental framework using documentary analysis, published baseline evidence, and illustrative engineering calculations; the household survey and environmental sampling components are presented as planned fieldwork and are not treated as completed results. The documentary analysis confirms that RNPP comprises two VVER-1200 units with a combined electrical capacity of 2,400 MW and that Unit 1 reached the fuel-loading milestone in May 2026. The project also has substantial financial exposure: the original construction contract was approximately US$12.65 billion, while the project cost in Bangladesh taka has subsequently risen because of exchange-rate and project-cost revisions. Environmental calculations indicate that, under the stated assumptions, a cooling-tower configuration would evaporate approximately 0.63 m³/s of water per unit, while a hypothetical once-through system would require about 60 m³/s per unit. Published pre-operational radiological studies around RNPP provide baseline evidence that can support future monitoring. The main potential benefits identified are reliable baseload electricity, reduced exposure to fossil-fuel price volatility, employment and skills development, and technological capacity building. The principal challenges are high capital and financing costs, schedule and implementation risks, radioactive-waste management, water and thermal impacts, emergency preparedness, and the need for sustained public confidence. Overall, the study finds that RNPP’s contribution to Bangladesh’s sustainable development will depend on effective regulation, transparent governance, continuous environmental and radiological monitoring, responsible waste management, and successful commissioning and operation.

Zenodo (CERN European Organization for Nuclear Research)
Rajshahi University of Engineering and Technology (BD)
Openalex Percentile: Top 13%
Environmental and Social Impact Assessments
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon