Systemic barriers to circular economy adoption in UAE construction: Bayesian network evidence and a transition framework

Circular economy (CE) adoption in construction is increasingly promoted as a pathway for reducing construction and demolition waste (CDW), preserving material value, and improving resource efficiency. Yet CE implementation remains difficult because the barriers constraining circular construction are rarely isolated. They interact through procurement practices, stakeholder fragmentation, regulatory conditions, digital readiness, secondary-material markets, and investment behavior. Unlike conventional barrier-ranking studies that treat implementation barriers as independent obstacles, this study examines their probabilistic interdependencies in the UAE construction industry using a Bayesian Belief Network (BBN). A literature-based index of 25 barriers was developed across six dimensions: technological, economic, regulatory, organizational, infrastructure, and behavioral barriers. The index was validated by eight experts and assessed through survey responses from 60 UAE construction professionals. The analysis compares conventional independence-based ranking with an interdependence-based Network Propagation Impact (NPI) ranking. The findings show that complexity in shifting to CE (NPI = 0.1245), fragmentation of the building construction industry (NPI = 0.1212), and prioritization of cost and time (NPI = 0.1071) are the most systemically influential barriers. The results demonstrate that perceived severity and systemic influence are not equivalent, as barriers ranked moderately under direct assessment can become critical when their network propagation effects are considered. Building on these findings, the study develops an integrated CE transition framework linking foundational barrier domains, dominant propagation barriers, intervention levers, and expected outcomes. The study contributes by reframing CE implementation as a socio-technical transition challenge and by showing how BBN-based analysis can support more strategic prioritization of circular construction interventions in the UAE.

Authors

Institutions

Publication Details

Journal
Frontiers in Built Environment
Published
2026-11-04
DOI
https://doi.org/10.3389/fbuil.2026.1979368
Primary Topic
Sustainable Building Design and Assessment
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Systemic barriers to circular economy adoption in UAE construction: Bayesian network evidence and a transition framework

Zied Bahroun, Sara Abdulmaksoud, Serter Atabay, Ghassan Abu–Lebdeh et al.
Frontiers in Built Environment
Sustainable Building Design and Assessment
article

Systemic barriers to circular economy adoption in UAE construction: Bayesian network evidence and a transition framework

Zied Bahroun, Sara Abdulmaksoud, Serter Atabay, Ghassan Abu–Lebdeh, Sabreen Dar Amer
article en

Abstract

Circular economy (CE) adoption in construction is increasingly promoted as a pathway for reducing construction and demolition waste (CDW), preserving material value, and improving resource efficiency. Yet CE implementation remains difficult because the barriers constraining circular construction are rarely isolated. They interact through procurement practices, stakeholder fragmentation, regulatory conditions, digital readiness, secondary-material markets, and investment behavior. Unlike conventional barrier-ranking studies that treat implementation barriers as independent obstacles, this study examines their probabilistic interdependencies in the UAE construction industry using a Bayesian Belief Network (BBN). A literature-based index of 25 barriers was developed across six dimensions: technological, economic, regulatory, organizational, infrastructure, and behavioral barriers. The index was validated by eight experts and assessed through survey responses from 60 UAE construction professionals. The analysis compares conventional independence-based ranking with an interdependence-based Network Propagation Impact (NPI) ranking. The findings show that complexity in shifting to CE (NPI = 0.1245), fragmentation of the building construction industry (NPI = 0.1212), and prioritization of cost and time (NPI = 0.1071) are the most systemically influential barriers. The results demonstrate that perceived severity and systemic influence are not equivalent, as barriers ranked moderately under direct assessment can become critical when their network propagation effects are considered. Building on these findings, the study develops an integrated CE transition framework linking foundational barrier domains, dominant propagation barriers, intervention levers, and expected outcomes. The study contributes by reframing CE implementation as a socio-technical transition challenge and by showing how BBN-based analysis can support more strategic prioritization of circular construction interventions in the UAE.

Frontiers in Built EnvironmentVol. 12
American University of Sharjah (AE)
Openalex Percentile: Top 18%
Sustainable Building Design and Assessment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon