DESIGN OF A MOBILE APPLICATION FOR REAL-TIME MONITORING OF CONSTRUCTION PROJECT PROGRESS, MATERIALS, AND MANPOWER

This development-oriented capstone examined construction monitoringpractices and the requirements for a mobile application integrating project progress,materials, and manpower records. The manuscript reports a purposive sample of 20participants comprising five civil engineers, five site supervisors, five projectmanagers, and five construction workers associated with the study setting in BacolodCity. Existing-practice responses in the original summary indicate agreement thatspreadsheets are used for project progress tracking (75%) and that material recordsare maintained manually (85%). Respondents also identified delayed reporting (90%)and limited access to current project information (95%) as concerns. Desired-featureresponses indicate strong preference for timely data updates (100% agreement) andintegrated monitoring (95% agreement); these figures describe respondentpreferences rather than verified software performance. The manuscript additionally reports post-test mean ratings for ease ofnavigation (4.3/5), perceived accuracy of updates (4.5/5), and satisfaction (4.4/5), withan average recorded task time of 8.2 minutes. Because individual responses, testconditions, completion logs, and reference-value comparisons have not yet beenreconciled with the summaries, these outcomes are provisional. This revisedmanuscript specifies an application evaluation question, objective task metrics,construction progress measurement procedures, and required system, validation, andprivacy documentation. It concludes that the reported needs support development ofan integrated monitoring prototype, while claims concerning measured performanceand project-level effectiveness require documented verification.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-04
DOI
https://doi.org/10.5281/zenodo.23964925
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

DESIGN OF A MOBILE APPLICATION FOR REAL-TIME MONITORING OF CONSTRUCTION PROJECT PROGRESS, MATERIALS, AND MANPOWER

Gelasan Saylo, Krischan, CE, SO2, RMP
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

DESIGN OF A MOBILE APPLICATION FOR REAL-TIME MONITORING OF CONSTRUCTION PROJECT PROGRESS, MATERIALS, AND MANPOWER

Gelasan Saylo, Krischan, CE, SO2, RMP
article en

Abstract

This development-oriented capstone examined construction monitoringpractices and the requirements for a mobile application integrating project progress,materials, and manpower records. The manuscript reports a purposive sample of 20participants comprising five civil engineers, five site supervisors, five projectmanagers, and five construction workers associated with the study setting in BacolodCity. Existing-practice responses in the original summary indicate agreement thatspreadsheets are used for project progress tracking (75%) and that material recordsare maintained manually (85%). Respondents also identified delayed reporting (90%)and limited access to current project information (95%) as concerns. Desired-featureresponses indicate strong preference for timely data updates (100% agreement) andintegrated monitoring (95% agreement); these figures describe respondentpreferences rather than verified software performance. The manuscript additionally reports post-test mean ratings for ease ofnavigation (4.3/5), perceived accuracy of updates (4.5/5), and satisfaction (4.4/5), withan average recorded task time of 8.2 minutes. Because individual responses, testconditions, completion logs, and reference-value comparisons have not yet beenreconciled with the summaries, these outcomes are provisional. This revisedmanuscript specifies an application evaluation question, objective task metrics,construction progress measurement procedures, and required system, validation, andprivacy documentation. It concludes that the reported needs support development ofan integrated monitoring prototype, while claims concerning measured performanceand project-level effectiveness require documented verification.

Zenodo (CERN European Organization for Nuclear Research)
Cebu Technological University (PH)
Openalex Percentile: Top 13%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
DESIGN OF A MOBILE APPLICATION FOR REAL-TIME MONITORING OF CONSTRUCTION PROJECT PROGRESS, MATERIALS, AND MANPOWER — Gelasan Saylo, Krischan, CE, SO2, RMP · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS