Coordinated Planning of Distribution-Side Distributed Generation and Energy Storage Considering Transmission–Distribution Coupling

Against the backdrop of the dual carbon goals of carbon peaking and carbon neutrality and the increasing penetration of renewable energy, conventional hierarchical planning methods for transmission and distribution networks are becoming insufficient to accurately characterize power exchange, boundary-voltage feasibility, and reserve support at the point of common coupling (PCC). This may lead to mismatches between distribution-side generation–storage planning decisions and actual system operating boundaries. To address this issue, this paper proposes a coordinated planning method for distribution-side distributed PV generation and energy storage that accounts for transmission–distribution coupling. First, the PCC is modeled as the physical interface between the transmission and distribution networks, and power-exchange balance, boundary-voltage feasibility, and interface-capacity constraints are introduced to transform traditionally exogenous boundary conditions into endogenous constraints. Then, a multi-objective planning model is developed to minimize annualized investment cost, operating cost, and PV curtailment rate, while considering transmission-network power flow, distribution-network voltage constraints, line-capacity limits, energy-storage state of charge, charging/discharging restrictions, and reserve-margin requirements jointly determined by allowable deviations in PV output and load demand. Finally, to address the computational burden caused by the nesting of multi-objective planning and full-year coordinated transmission–distribution operational verification, a hierarchical solution framework tailored to the model structure is developed. The outer-layer MOEA/D searches for PV–ESS capacity configurations, the middle-layer surrogate model screens candidate solutions requiring exact evaluation, and the inner-layer ADMM coordinates PCC boundary variables between the transmission and distribution sides, thereby obtaining a Pareto solution set that satisfies cross-level operating constraints. The results of an 8760 h case study on a typical regional power system show that compared with the conventional hierarchical planning scheme, the proposed method reduces the PV curtailment rate from 8.7% to 4.6%, increases PV utilization hours from 1160 h to 1375 h, reduces the peak power imported at the PCC from 8.2 MW to 6.5 MW, and reduces the total annualized system cost by 9.3%, while satisfying network-security and voltage constraints. The proposed method can quantitatively evaluate the comprehensive performance of alternative PV–ESS configurations in terms of PCC power exchange, distribution-network voltage constraints, and annual operating cost, thereby providing a planning tool for the siting and sizing of distribution-side PV and storage in regional grids with clearly defined transmission–distribution boundaries.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-11-03
DOI
https://doi.org/10.3390/pr14213544
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Coordinated Planning of Distribution-Side Distributed Generation and Energy Storage Considering Transmission–Distribution Coupling

Fuwei Zhang, Jinrong Zhu, Wei Gao, Peidong Li et al.
Processes
Electric Power System Optimization
article

Coordinated Planning of Distribution-Side Distributed Generation and Energy Storage Considering Transmission–Distribution Coupling

Fuwei Zhang, Jinrong Zhu, Wei Gao, Peidong Li, Gang Lin, Chongyu Liu, Shenglin Zhang, Heng Zhang, Qingqiang Liu
article en

Abstract

Against the backdrop of the dual carbon goals of carbon peaking and carbon neutrality and the increasing penetration of renewable energy, conventional hierarchical planning methods for transmission and distribution networks are becoming insufficient to accurately characterize power exchange, boundary-voltage feasibility, and reserve support at the point of common coupling (PCC). This may lead to mismatches between distribution-side generation–storage planning decisions and actual system operating boundaries. To address this issue, this paper proposes a coordinated planning method for distribution-side distributed PV generation and energy storage that accounts for transmission–distribution coupling. First, the PCC is modeled as the physical interface between the transmission and distribution networks, and power-exchange balance, boundary-voltage feasibility, and interface-capacity constraints are introduced to transform traditionally exogenous boundary conditions into endogenous constraints. Then, a multi-objective planning model is developed to minimize annualized investment cost, operating cost, and PV curtailment rate, while considering transmission-network power flow, distribution-network voltage constraints, line-capacity limits, energy-storage state of charge, charging/discharging restrictions, and reserve-margin requirements jointly determined by allowable deviations in PV output and load demand. Finally, to address the computational burden caused by the nesting of multi-objective planning and full-year coordinated transmission–distribution operational verification, a hierarchical solution framework tailored to the model structure is developed. The outer-layer MOEA/D searches for PV–ESS capacity configurations, the middle-layer surrogate model screens candidate solutions requiring exact evaluation, and the inner-layer ADMM coordinates PCC boundary variables between the transmission and distribution sides, thereby obtaining a Pareto solution set that satisfies cross-level operating constraints. The results of an 8760 h case study on a typical regional power system show that compared with the conventional hierarchical planning scheme, the proposed method reduces the PV curtailment rate from 8.7% to 4.6%, increases PV utilization hours from 1160 h to 1375 h, reduces the peak power imported at the PCC from 8.2 MW to 6.5 MW, and reduces the total annualized system cost by 9.3%, while satisfying network-security and voltage constraints. The proposed method can quantitatively evaluate the comprehensive performance of alternative PV–ESS configurations in terms of PCC power exchange, distribution-network voltage constraints, and annual operating cost, thereby providing a planning tool for the siting and sizing of distribution-side PV and storage in regional grids with clearly defined transmission–distribution boundaries.

ProcessesVol. 14(21)
North China Electric Power University (CN), Linyi University (CN), State Grid Corporation of China (China) (CN), Shanghai Electric (China) (CN)
Openalex Percentile: Top 25%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon