INTELLIGENT_D2.4_Project requirements, solution design and KPIs [M6]
This deliverable presents system requirements, technical specifications and key performance indicators for the INTELLIGENT project’s core solutions, the GSY DEX, FOS, and EWDS. The report also assesses the technical readiness of four pilot sites, identifying data measurement diversity and other infrastructure limitations affecting the planned development simulations and demonstrations. Mitigation strategies are proposed to address the identified technical challenges. A comprehensive KPI framework is proposed to evaluate project innovation across multiple dimensions. This deliverable will serve to guide project research and development, including user interface design, and thereafter demonstration and dissemination activities.
Authors
- Energy Web AG (EWAG)
- Grid Singularity GmbH (GSY)
- University of Cologne (UoC)
- Technical University of Munich (TUM)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-03
- DOI
- https://doi.org/10.5281/zenodo.23925043
- Primary Topic
- Engineering and Information Technology
- Type
- article
- Field-Weighted Citation Impact
- 0.00