Optimizing Production Planning in the Banbury Mixing Process via Modified FCMRP: A Tire Manufacturing Case Study

Production planning in the Banbury mixing process presents unique scheduling challenges, primarily due to complex alternative Bill of Materials (BOM) routing and mandatory natural aging constraints. This study addresses the severe operational inefficiencies—specifically, excessive lead times and high machine idle time ratios—currently faced by a real-world tire manufacturing company. To resolve these issues, we propose a modified Finite Capacity Material Requirements Planning (FCMRP) framework. This approach dynamically calculates job release times based on predecessor due times and previous order finish times to effectively accommodate mandatory resting periods. To determine the most effective scheduling strategy, we systematically evaluate the company's baseline Highest Order Quantity (HOQ) rule against standard Earliest Release Time (ERT) and Shortest Processing Time (SPT) heuristics. Furthermore, we introduce a novel Non-Alternative Machine (NAM) sub-rule designed to intelligently isolate and reallocate movable excess jobs to alleviate machine bottlenecks. The experimental results demonstrate that combining the ERT rule with the NAM sub-rule successfully reduces bottleneck workloads and yields the optimal overall lead time. Conversely, applying ERT without the NAM logic provides the best machine idle time ratio. Ultimately, this research delivers a practical, data-driven framework for selecting priority rules to optimize complex mixing processes in the manufacturing industry.

Authors

Publication Details

Journal
Interdisciplinary Research Review
Published
2026-11-03
DOI
https://doi.org/10.14456/irr.2026.21
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Production Planning in the Banbury Mixing Process via Modified FCMRP: A Tire Manufacturing Case Study

Anan Butrat
1 links
Interdisciplinary Research Review
Scheduling and Optimization Algorithms
article

Optimizing Production Planning in the Banbury Mixing Process via Modified FCMRP: A Tire Manufacturing Case Study

Anan Butrat
article en

Abstract

Production planning in the Banbury mixing process presents unique scheduling challenges, primarily due to complex alternative Bill of Materials (BOM) routing and mandatory natural aging constraints. This study addresses the severe operational inefficiencies—specifically, excessive lead times and high machine idle time ratios—currently faced by a real-world tire manufacturing company. To resolve these issues, we propose a modified Finite Capacity Material Requirements Planning (FCMRP) framework. This approach dynamically calculates job release times based on predecessor due times and previous order finish times to effectively accommodate mandatory resting periods. To determine the most effective scheduling strategy, we systematically evaluate the company's baseline Highest Order Quantity (HOQ) rule against standard Earliest Release Time (ERT) and Shortest Processing Time (SPT) heuristics. Furthermore, we introduce a novel Non-Alternative Machine (NAM) sub-rule designed to intelligently isolate and reallocate movable excess jobs to alleviate machine bottlenecks. The experimental results demonstrate that combining the ERT rule with the NAM sub-rule successfully reduces bottleneck workloads and yields the optimal overall lead time. Conversely, applying ERT without the NAM logic provides the best machine idle time ratio. Ultimately, this research delivers a practical, data-driven framework for selecting priority rules to optimize complex mixing processes in the manufacturing industry.

Interdisciplinary Research Review
Industry, innovation and infrastructure, Responsible consumption and production
Openalex Percentile: Top 15%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Optimizing Production Planning in the Banbury Mixing Process via Modified FCMRP: A Tire Manufacturing Case Study — Anan Butrat · Interdisciplinary Research Review (2026) | TGRS Research Map | TGRS