Sharp Concurrence Bounds for a Reflected-Line Construction

A reflected-line construction gives at most three distinct concurrent inputs, and an exact example attains the bound. A quintic coefficient comparison proves the result. A variable construction ratio has a sharp transition between maxima of five and three concurrent inputs.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-02
DOI
https://doi.org/10.5281/zenodo.23887922
Primary Topic
Mathematics and Applications
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
preprint

Sharp Concurrence Bounds for a Reflected-Line Construction

Ziping Guo
Zenodo (CERN European Organization for Nuclear Research)
Mathematics and Applications
preprint

Sharp Concurrence Bounds for a Reflected-Line Construction

Ziping Guo
preprint en

Abstract

A reflected-line construction gives at most three distinct concurrent inputs, and an exact example attains the bound. A quintic coefficient comparison proves the result. A variable construction ratio has a sharp transition between maxima of five and three concurrent inputs.

Zenodo (CERN European Organization for Nuclear Research)
Mathematics and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Sharp Concurrence Bounds for a Reflected-Line Construction — Ziping Guo · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS