Policy Timing and Energy Investment in China

Calendar choice changes the financial terms assigned to energy projects. This paper measures that change using 423 enterprise and institutional distributed-photovoltaic projects in two Shanghai subsidy directories, then traces the legal timing of support through three paired regulatory histories. Reconstruction from the governing rule, reported reward cohort and project category matches every published reward rate. Using connection year alone misclassifies 31 projects, representing 16.55 MW, and understates their scheduled reward by RMB 0.05–0.12 per kWh, or 33–50%. The directory headings identify ten cohort and category groups; a separate reconstruction recovers the assignments with printed reward-rate phrases withheld. In Anhui, Shandong and Zhejiang, tracked financing mechanisms appear in verified predecessor provisions 9–13 calendar years before the recent legal text. Clause comparisons distinguish inherited financial terms from amended target wording and administrative changes. Together, the project and legal records show how an available document date can misrepresent both support intensity and the history of a mechanism. Linking rules, eligible cohorts and legal versions connects policy measurement to the financial margin and project stage governing investment.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-02
DOI
https://doi.org/10.5281/zenodo.23889501
Primary Topic
Renewable Energy and Sustainability
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
preprint

Policy Timing and Energy Investment in China

Fuli Yang, Tingting Qiu
1 links
Zenodo (CERN European Organization for Nuclear Research)
Renewable Energy and Sustainability
preprint

Policy Timing and Energy Investment in China

Fuli Yang, Tingting Qiu
preprint en

Abstract

Calendar choice changes the financial terms assigned to energy projects. This paper measures that change using 423 enterprise and institutional distributed-photovoltaic projects in two Shanghai subsidy directories, then traces the legal timing of support through three paired regulatory histories. Reconstruction from the governing rule, reported reward cohort and project category matches every published reward rate. Using connection year alone misclassifies 31 projects, representing 16.55 MW, and understates their scheduled reward by RMB 0.05–0.12 per kWh, or 33–50%. The directory headings identify ten cohort and category groups; a separate reconstruction recovers the assignments with printed reward-rate phrases withheld. In Anhui, Shandong and Zhejiang, tracked financing mechanisms appear in verified predecessor provisions 9–13 calendar years before the recent legal text. Clause comparisons distinguish inherited financial terms from amended target wording and administrative changes. Together, the project and legal records show how an available document date can misrepresent both support intensity and the history of a mechanism. Linking rules, eligible cohorts and legal versions connects policy measurement to the financial margin and project stage governing investment.

Zenodo (CERN European Organization for Nuclear Research)
Affordable and clean energy, Climate action, Peace, justice, and strong institutions
Renewable Energy and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon