Beyond the laggard myth: time-series analysis of AI job market dynamics in construction

Purpose This study presents one of the first time-series, cross-industry analyses of the artificial intelligence (AI) job market for the construction sector. It benchmarks construction against both digital and traditional industries to interrogate prevailing assumptions of linear diffusion and temporal catch-up in AI workforce adoption. Design/methodology/approach Drawing on 51 months of Lightcast job postings (January 2021–March 2025), with construction defined as ANZSIC Division E, the study employs an interpretable analytical toolkit comprising Seasonal-Trend decomposition using Loess decomposition (period = 12), month-of-year bootstrap tests on detrended series, cross-correlation analysis with bootstrap confidence bands, Newey–West trend estimation on sectoral share ratios and conservative one-step Exponential Smoothing State-Space (ETS) forecasts. All results are re-estimated excluding the partial final month (March 2025) as a sensitivity check. Findings Construction's AI hiring is very sparse, accounting for under 1% of AI postings and is more volatile than hiring in peer sectors, but it grew fastest: annual construction postings rose more than fourfold between 2021 and 2024, against increases of 13% and 9% in the digital and traditional sectors, whose postings peaked in 2022. Construction's share of AI postings relative to both comparators therefore rises (converges) rather than falls. No delayed-follower pattern is detected: no lag at which the comparator sectors lead construction is statistically reliable, and the short-run associations that are detected are weak, near-contemporaneous and sensitive to the sample end. Unlike the comparator sectors, construction shows no statistically significant within-year seasonality and short-horizon ETS forecasts do not improve on a seasonal-naïve benchmark. These findings are robust to the exclusion of the partial final month of data. Construction thus appears as a low-base, fast-growing entrant with its own hiring dynamics, not a “laggard” following digital-sector cycles with a delay. Practical implications The findings suggest that construction firms should prioritise internal capability building and domain-specific AI skills where external hiring is thin, support flexible, year-round upskilling, and design policy and vendor strategies tailored to the sector's operational realities rather than importing digital-sector playbooks. Originality/value This study provides among the first data-driven, time-series evidence that qualifies the dominant “late adopter” narrative in construction. It shows that construction's low level of AI hiring coexists with the fastest growth and a rising share, without a delayed-follower timing pattern, distinguishing a low starting point from a lagging trajectory and offering an empirically grounded alternative to technologically deterministic accounts of cross-industry AI adoption.

Authors

Institutions

Publication Details

Journal
Smart and Sustainable Built Environment
Published
2026-10-31
DOI
https://doi.org/10.1108/sasbe-03-2026-0225
Primary Topic
Labor market dynamics and wage inequality
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Beyond the laggard myth: time-series analysis of AI job market dynamics in construction

Masoud Gheisari, Mehrdad Arashpour, Faris Elghaish, Roger Vergés et al.
Smart and Sustainable Built Environment
Labor market dynamics and wage inequality
article

Beyond the laggard myth: time-series analysis of AI job market dynamics in construction

Masoud Gheisari, Mehrdad Arashpour, Faris Elghaish, Roger Vergés, M. Reza Hosseini, Prof. Farzad Rahimian
article en

Abstract

Purpose This study presents one of the first time-series, cross-industry analyses of the artificial intelligence (AI) job market for the construction sector. It benchmarks construction against both digital and traditional industries to interrogate prevailing assumptions of linear diffusion and temporal catch-up in AI workforce adoption. Design/methodology/approach Drawing on 51 months of Lightcast job postings (January 2021–March 2025), with construction defined as ANZSIC Division E, the study employs an interpretable analytical toolkit comprising Seasonal-Trend decomposition using Loess decomposition (period = 12), month-of-year bootstrap tests on detrended series, cross-correlation analysis with bootstrap confidence bands, Newey–West trend estimation on sectoral share ratios and conservative one-step Exponential Smoothing State-Space (ETS) forecasts. All results are re-estimated excluding the partial final month (March 2025) as a sensitivity check. Findings Construction's AI hiring is very sparse, accounting for under 1% of AI postings and is more volatile than hiring in peer sectors, but it grew fastest: annual construction postings rose more than fourfold between 2021 and 2024, against increases of 13% and 9% in the digital and traditional sectors, whose postings peaked in 2022. Construction's share of AI postings relative to both comparators therefore rises (converges) rather than falls. No delayed-follower pattern is detected: no lag at which the comparator sectors lead construction is statistically reliable, and the short-run associations that are detected are weak, near-contemporaneous and sensitive to the sample end. Unlike the comparator sectors, construction shows no statistically significant within-year seasonality and short-horizon ETS forecasts do not improve on a seasonal-naïve benchmark. These findings are robust to the exclusion of the partial final month of data. Construction thus appears as a low-base, fast-growing entrant with its own hiring dynamics, not a “laggard” following digital-sector cycles with a delay. Practical implications The findings suggest that construction firms should prioritise internal capability building and domain-specific AI skills where external hiring is thin, support flexible, year-round upskilling, and design policy and vendor strategies tailored to the sector's operational realities rather than importing digital-sector playbooks. Originality/value This study provides among the first data-driven, time-series evidence that qualifies the dominant “late adopter” narrative in construction. It shows that construction's low level of AI hiring coexists with the fastest growth and a rising share, without a delayed-follower timing pattern, distinguishing a low starting point from a lagging trajectory and offering an empirically grounded alternative to technologically deterministic accounts of cross-industry AI adoption.

Smart and Sustainable Built Environment
Queen's University Belfast (GB), Loughborough University (GB), The University of Melbourne (AU), University of Florida (US), Monash University (AU), Universitat Politècnica de Catalunya (ES)
Openalex Percentile: Top 8%
Labor market dynamics and wage inequality
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon