Chemical Treatment Using Completion Rig Achieves Gains Without Service Vessel

_ This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 36149, “Innovative Autonomous Chemical Treatment Using Completion Rig: Achieving Gains Without Well-Service Stimulation Vessel,” by Fernando A. Silva, Mario G. da Silva, and Rodrigo S. Tavares, Petrobras, et al. The paper has not been peer-reviewed. _ This paper presents a comprehensive analysis of autonomous scale-management strategies implemented in the Buzios Field that eliminate the need for a well-service stimulation vessel by using existing facilities onboard the well rig. This paper presents a comprehensive analysis of autonomous scale-management strategies implemented in the Buzios Field that eliminates the need for a well-service stimulation vessel (WSSV) by using the existing facilities onboard the well rig. The proposed approach includes the removal and inhibition of inorganic scale using chemical treatments and operational protocols. By leveraging rig-based infrastructure, this methodology has delivered significant improvements in operational efficiency and well productivity while reducing logistical complexity and costs. Scaling Challenges in the Buzios Field Discovered in 2010, the Buzios field offshore Brazil holds the distinction of being the world’s largest ultradeepwater oil field. This globally significant asset is renowned for its substantial hydrocarbon reserves, low exploration risks, and competitive extraction costs. Water depths in the field range from 1,500 to 2,200 m, while its reservoirs are located between 5,000 and 6,000 m below sea level. These reservoirs primarily are composed of biogenic carbonate rocks deposited in a lacustrine environment overlain by a thick overburden of siliciclastic and salt formations. The heterogeneity and complexity of the carbonate reservoir, combined with the substantial thickness of the producing intervals, require the use of intelligent well completions in most wells to ensure effective field management. From the earliest stages of Buzios development plans, intelligent well completion was identified as a critical component for optimizing production. This approach not only aims to enhance overall reservoir management but also equips the technical team with greater flexibility to address reservoir uncertainties and maximize production efficiency.

Authors

Publication Details

Journal
Journal of Petroleum Technology
Published
2026-11-01
DOI
https://doi.org/10.2118/1126-0018-jpt
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Chemical Treatment Using Completion Rig Achieves Gains Without Service Vessel

Chris Carpenter
1 links
Journal of Petroleum Technology
Drilling and Well Engineering
article

Chemical Treatment Using Completion Rig Achieves Gains Without Service Vessel

Chris Carpenter
article en

Abstract

_ This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper OTC 36149, “Innovative Autonomous Chemical Treatment Using Completion Rig: Achieving Gains Without Well-Service Stimulation Vessel,” by Fernando A. Silva, Mario G. da Silva, and Rodrigo S. Tavares, Petrobras, et al. The paper has not been peer-reviewed. _ This paper presents a comprehensive analysis of autonomous scale-management strategies implemented in the Buzios Field that eliminate the need for a well-service stimulation vessel by using existing facilities onboard the well rig. This paper presents a comprehensive analysis of autonomous scale-management strategies implemented in the Buzios Field that eliminates the need for a well-service stimulation vessel (WSSV) by using the existing facilities onboard the well rig. The proposed approach includes the removal and inhibition of inorganic scale using chemical treatments and operational protocols. By leveraging rig-based infrastructure, this methodology has delivered significant improvements in operational efficiency and well productivity while reducing logistical complexity and costs. Scaling Challenges in the Buzios Field Discovered in 2010, the Buzios field offshore Brazil holds the distinction of being the world’s largest ultradeepwater oil field. This globally significant asset is renowned for its substantial hydrocarbon reserves, low exploration risks, and competitive extraction costs. Water depths in the field range from 1,500 to 2,200 m, while its reservoirs are located between 5,000 and 6,000 m below sea level. These reservoirs primarily are composed of biogenic carbonate rocks deposited in a lacustrine environment overlain by a thick overburden of siliciclastic and salt formations. The heterogeneity and complexity of the carbonate reservoir, combined with the substantial thickness of the producing intervals, require the use of intelligent well completions in most wells to ensure effective field management. From the earliest stages of Buzios development plans, intelligent well completion was identified as a critical component for optimizing production. This approach not only aims to enhance overall reservoir management but also equips the technical team with greater flexibility to address reservoir uncertainties and maximize production efficiency.

Journal of Petroleum TechnologyVol. 78(11)
Industry, innovation and infrastructure
Openalex Percentile: Top 19%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon