Feasibility Evaluation of The Probowangi Toll Road For Enhancing Accessibility and Connectivity in Banyuwangi Regency

The construction of the Probolinggo–Banyuwangi (Probowangi) Toll Road, as a national strategic project, is expected to enhance regional connectivity and accessibility in East Java. With a total length of 123,5 km, this infrastructure is projected to reduce congestion, lower logistics costs, and improve the efficiency of goods distribution and mobility. This research evaluates the project's economic and financial feasibility, as well as its impact on improved accessibility in Banyuwangi Regency. The research employs a literature review, secondary data analysis, economic feasibility analysis (BCR, NPV, IRR), financial analysis, and socio-economic impact assessment. The results indicate that the project is feasible, with significant benefits in improving transport efficiency, generating economic opportunities, and supporting regional development along the corridor. The Probowangi Toll Road is therefore considered a strategic infrastructure to promote balanced regional development and strengthen connectivity between Java and Bali.

Authors

Institutions

Publication Details

Journal
Rekayasa Sipil
Published
2026-10-30
DOI
https://doi.org/10.21776/ub.rekayasasipil.2026.020.03.7
Primary Topic
Transportation Systems and Logistics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Feasibility Evaluation of The Probowangi Toll Road For Enhancing Accessibility and Connectivity in Banyuwangi Regency

Dzackirendy Springfield, Gde Bayu Mahatmanda Sudana, Angga Tri Budiatma
3 links
Rekayasa Sipil
Transportation Systems and Logistics
article

Feasibility Evaluation of The Probowangi Toll Road For Enhancing Accessibility and Connectivity in Banyuwangi Regency

Dzackirendy Springfield, Gde Bayu Mahatmanda Sudana, Angga Tri Budiatma
article en

Abstract

The construction of the Probolinggo–Banyuwangi (Probowangi) Toll Road, as a national strategic project, is expected to enhance regional connectivity and accessibility in East Java. With a total length of 123,5 km, this infrastructure is projected to reduce congestion, lower logistics costs, and improve the efficiency of goods distribution and mobility. This research evaluates the project's economic and financial feasibility, as well as its impact on improved accessibility in Banyuwangi Regency. The research employs a literature review, secondary data analysis, economic feasibility analysis (BCR, NPV, IRR), financial analysis, and socio-economic impact assessment. The results indicate that the project is feasible, with significant benefits in improving transport efficiency, generating economic opportunities, and supporting regional development along the corridor. The Probowangi Toll Road is therefore considered a strategic infrastructure to promote balanced regional development and strengthen connectivity between Java and Bali.

Rekayasa SipilVol. 20(3)
Politeknik Negeri Banyuwangi (ID)
Industry, innovation and infrastructure, Sustainable cities and communities
Openalex Percentile: Top 19%
Transportation Systems and Logistics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Feasibility Evaluation of The Probowangi Toll Road For Enhancing Accessibility and Connectivity in Banyuwangi Regency — Dzackirendy Springfield, Gde Bayu Mahatmanda Sudana, et al. · Rekayasa Sipil (2026) | TGRS Research Map | TGRS