Multi-Objective Optimal Gate Control and Hydropower Scheduling of Haditha Dam Using the Improved Harris Hawks Multi-Objective (IMOHHO) Algorithm with Long Short-Term Memory (LSTM)

Effective water management requires accurate forecasting of dam inflows, rainfall, and actual electricity demand. In this paper, we propose a framework for intelligent control of Haditha Dam gates using the improved Harris Hawks Multi-Objective algorithm (IMOHHO) with Long Short-Term Memory (LSTM). The study aims to develop a framework for scheduling the operation of the gates that strikes a balance between maximizing hydropower generation, maintaining storage levels close to the target value, reducing unused discharge, and optimizing the operations of the gates. This ensures that a minimum net head of a 147 m water level in the dam reservoir is maintained. The proposed model was applied to the Haditha Dam using operational gates and a 48-step time horizon with an interval of 30 min that could be changed as needed. In the IMOHHO-LSTM algorithm, each filtered solution represents an integrated timeline for the opening of the six gates throughout the runtime; the algorithm relies on the concept of non-dominant solutions and creates an archive of optimal solutions using the Pareto interface to achieve a balance between different operational objectives. The final results showed the potential of the proposed algorithm to ensure the efficient operation of the dam, with a total power generation of 10,434.14 MWh, while the average output power was 434.76 MW. The maximum capacity reached 660 MW, which represents the maximum design capacity of a modern dam. Furthermore, the model kept the storage level within a very narrow range of 2199 to 2206 Mm3, centering around the target storage value of 2200 Mm3. This confirms the passing of the IMOHHO-LSTM algorithm in balancing energy production with maintaining the operational requirements of the dam lake’s water level.

Authors

Institutions

Publication Details

Journal
Hydrology
Published
2026-10-29
DOI
https://doi.org/10.3390/hydrology13110291
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Objective Optimal Gate Control and Hydropower Scheduling of Haditha Dam Using the Improved Harris Hawks Multi-Objective (IMOHHO) Algorithm with Long Short-Term Memory (LSTM)

Qian Zhang, Badr M. Abdullah, Khalid Hashim, Omar A. Aldhaibani et al.
1 links
Hydrology
Water resources management and optimization
article

Multi-Objective Optimal Gate Control and Hydropower Scheduling of Haditha Dam Using the Improved Harris Hawks Multi-Objective (IMOHHO) Algorithm with Long Short-Term Memory (LSTM)

Qian Zhang, Badr M. Abdullah, Khalid Hashim, Omar A. Aldhaibani, Mukesh Kumar Maheshwari, Yongqiang Qiu, Alessandro Raschellà, Amer Salih, Ahmed Mohammed
article en

Abstract

Effective water management requires accurate forecasting of dam inflows, rainfall, and actual electricity demand. In this paper, we propose a framework for intelligent control of Haditha Dam gates using the improved Harris Hawks Multi-Objective algorithm (IMOHHO) with Long Short-Term Memory (LSTM). The study aims to develop a framework for scheduling the operation of the gates that strikes a balance between maximizing hydropower generation, maintaining storage levels close to the target value, reducing unused discharge, and optimizing the operations of the gates. This ensures that a minimum net head of a 147 m water level in the dam reservoir is maintained. The proposed model was applied to the Haditha Dam using operational gates and a 48-step time horizon with an interval of 30 min that could be changed as needed. In the IMOHHO-LSTM algorithm, each filtered solution represents an integrated timeline for the opening of the six gates throughout the runtime; the algorithm relies on the concept of non-dominant solutions and creates an archive of optimal solutions using the Pareto interface to achieve a balance between different operational objectives. The final results showed the potential of the proposed algorithm to ensure the efficient operation of the dam, with a total power generation of 10,434.14 MWh, while the average output power was 434.76 MW. The maximum capacity reached 660 MW, which represents the maximum design capacity of a modern dam. Furthermore, the model kept the storage level within a very narrow range of 2199 to 2206 Mm3, centering around the target storage value of 2200 Mm3. This confirms the passing of the IMOHHO-LSTM algorithm in balancing energy production with maintaining the operational requirements of the dam lake’s water level.

HydrologyVol. 13(11)
Bahria University (PK), Liverpool John Moores University (GB)
Affordable and clean energy, Industry, innovation and infrastructure, Clean water and sanitation, Climate action
Openalex Percentile: Top 19%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon