Greenfield Development of Canal-Based Small Hydropower in Uzbekistan: Site Screening, PPP Risk Allocation and Climate Resilience through the Water-Energy-Food Nexus

Uzbekistan is seeking to expand hydropower while modernizing an irrigation system that supports rural livelihoods and dominates national water use. Existing canals create a distinctive greenfield opportunity: small plants can add distributed renewable generation with limited new inundation, but their output remains subordinate to irrigation schedules, water rights and climate uncertainty. This paper develops an integrated framework for converting a large site list into an investable portfolio. It combines policy and project-document review with a two-stage multi-criteria model, hydrological stress testing and normative public-private partnership risk allocation. Stage 1 applies fatal-flaw gates for water access, irrigation non-impairment, grid and land feasibility, and environmental-social eligibility. Stage 2 ranks eligible sites by water reliability, energy yield, irrigation compatibility, cost, connection, impact and sponsor readiness. An illustration shows why a high-head location can rank below a more water-compatible site. The financing design links concessional wholesale funding and local banks to project companies, standardized contracts and verified operating data. Climate parameters remain scenarios: the severe case tests a 30–40 percent water-availability decline with a 25 percent irrigation-demand increase. The paper reconciles the 8–12 GW resource range and 5.5–6 GW target range by distinguishing assessment boundaries, technical potential, program staging and date. The central finding is that canal hydropower should be developed as a governed portfolio of water-compatible infrastructure. Transparent screening, irrigation-first operating rules and efficient risk assignment can reduce development attrition and improve resilience.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-10-29
DOI
https://doi.org/10.5281/zenodo.23770263
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Greenfield Development of Canal-Based Small Hydropower in Uzbekistan: Site Screening, PPP Risk Allocation and Climate Resilience through the Water-Energy-Food Nexus

Wang Liang
1 links
Zenodo (CERN European Organization for Nuclear Research)
Water resources management and optimization
article

Greenfield Development of Canal-Based Small Hydropower in Uzbekistan: Site Screening, PPP Risk Allocation and Climate Resilience through the Water-Energy-Food Nexus

Wang Liang
article en

Abstract

Uzbekistan is seeking to expand hydropower while modernizing an irrigation system that supports rural livelihoods and dominates national water use. Existing canals create a distinctive greenfield opportunity: small plants can add distributed renewable generation with limited new inundation, but their output remains subordinate to irrigation schedules, water rights and climate uncertainty. This paper develops an integrated framework for converting a large site list into an investable portfolio. It combines policy and project-document review with a two-stage multi-criteria model, hydrological stress testing and normative public-private partnership risk allocation. Stage 1 applies fatal-flaw gates for water access, irrigation non-impairment, grid and land feasibility, and environmental-social eligibility. Stage 2 ranks eligible sites by water reliability, energy yield, irrigation compatibility, cost, connection, impact and sponsor readiness. An illustration shows why a high-head location can rank below a more water-compatible site. The financing design links concessional wholesale funding and local banks to project companies, standardized contracts and verified operating data. Climate parameters remain scenarios: the severe case tests a 30–40 percent water-availability decline with a 25 percent irrigation-demand increase. The paper reconciles the 8–12 GW resource range and 5.5–6 GW target range by distinguishing assessment boundaries, technical potential, program staging and date. The central finding is that canal hydropower should be developed as a governed portfolio of water-compatible infrastructure. Transparent screening, irrigation-first operating rules and efficient risk assignment can reduce development attrition and improve resilience.

Zenodo (CERN European Organization for Nuclear Research)
Al-Farabi Kazakh National University (KZ)
Affordable and clean energy, Climate action, Clean water and sanitation, Industry, innovation and infrastructure
Openalex Percentile: Top 19%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Greenfield Development of Canal-Based Small Hydropower in Uzbekistan: Site Screening, PPP Risk Allocation and Climate Resilience through the Water-Energy-Food Nexus — Wang Liang · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS