Abstract This paper presents the design of an ultra-high-voltage (UHV) ac substation with a highest voltage for equipment of 1100 kV that delivers 10 GW into a 400-kV network and verifies every rating-determining decision by simulation. Four 1100-kV feeders (2 × 280 km and 2 × 320 km, 8 × ACSR 630/45, surge-impedance loading 4203 MW) supply five banks of 3 × 1000-MVA single-phase autotransformers, and twelve 420-kV feeders on six double-circuit routes distribute it. One consistent set of models supports the design: Carson–Deri line parameters, a 24-bus Newton–Raphson load flow with N-1, N-2 and P–V analysis, IEC 60909 sequence-network short-circuit analysis, multimachine transient stability, a three-phase Bergeron electromagnetic-transient model with Monte Carlo switching, IEC 60287 and IEC 60076-7 thermal models, and a two-layer boundary-element grounding model. Simulation revealed six findings missed by a deterministic preliminary design: with solidly grounded neutrals the single-phase fault at a two-bank 420-kV section reaches the full 63-kA rating, which a 10-Ω neutral reactor reduces to 48.4 kA; 1600 Mvar of switched capacitors is needed to keep the STATCOMs in reserve; a stuck center breaker gives a critical clearing time of 108 ms, shorter than the 150-ms breaker-failure clearing, which 1.1-GW generation rejection raises to 166 ms; transformer-terminal and bay-located gas-insulated arresters are indispensable; the 420-kV transformer connections require gas-insulated lines in hot desert soil; and autotransformer neutral-current reversal makes the grid discharge 69.8 kA, more than the fault current. The verified design has 1800/2400-kV switching/lightning withstand levels with 3.7–8.5% and 15.5% margins, a 55% voltage-stability margin and 99.83% full-load efficiency.

Authors

Institutions

Publication Details

Journal
Research Square
Published
2026-10-30
DOI
https://doi.org/10.21203/rs.3.rs-11549878/v1
Primary Topic
High-Voltage Power Transmission Systems
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
preprint

Design and Simulation-Based Verification of an 1100‑kV AC Grid Substation Supplying a 10‑GW Load

Mohammad Ali
Research Square
High-Voltage Power Transmission Systems
preprint

Design and Simulation-Based Verification of an 1100‑kV AC Grid Substation Supplying a 10‑GW Load

Mohammad Ali
preprint en

Abstract

Abstract This paper presents the design of an ultra-high-voltage (UHV) ac substation with a highest voltage for equipment of 1100 kV that delivers 10 GW into a 400-kV network and verifies every rating-determining decision by simulation. Four 1100-kV feeders (2 × 280 km and 2 × 320 km, 8 × ACSR 630/45, surge-impedance loading 4203 MW) supply five banks of 3 × 1000-MVA single-phase autotransformers, and twelve 420-kV feeders on six double-circuit routes distribute it. One consistent set of models supports the design: Carson–Deri line parameters, a 24-bus Newton–Raphson load flow with N-1, N-2 and P–V analysis, IEC 60909 sequence-network short-circuit analysis, multimachine transient stability, a three-phase Bergeron electromagnetic-transient model with Monte Carlo switching, IEC 60287 and IEC 60076-7 thermal models, and a two-layer boundary-element grounding model. Simulation revealed six findings missed by a deterministic preliminary design: with solidly grounded neutrals the single-phase fault at a two-bank 420-kV section reaches the full 63-kA rating, which a 10-Ω neutral reactor reduces to 48.4 kA; 1600 Mvar of switched capacitors is needed to keep the STATCOMs in reserve; a stuck center breaker gives a critical clearing time of 108 ms, shorter than the 150-ms breaker-failure clearing, which 1.1-GW generation rejection raises to 166 ms; transformer-terminal and bay-located gas-insulated arresters are indispensable; the 420-kV transformer connections require gas-insulated lines in hot desert soil; and autotransformer neutral-current reversal makes the grid discharge 69.8 kA, more than the fault current. The verified design has 1800/2400-kV switching/lightning withstand levels with 3.7–8.5% and 15.5% margins, a 55% voltage-stability margin and 99.83% full-load efficiency.

Research Square
Atlantic International University (US)
Industry, innovation and infrastructure, Affordable and clean energy
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Design and Simulation-Based Verification of an 1100‑kV AC Grid Substation Supplying a 10‑GW Load — Mohammad Ali · Research Square (2026) | TGRS Research Map | TGRS