Two-stage robust project scheduling with material requirement planning

The primary objective of project scheduling is to provide a guideline for the successful completion of a project. Material requirement planning is also a crucial aspect because the cost of materials constitutes a significant proportion of the total project investment, and project activities cannot proceed without them. This paper aims to integrate these two components using a static two-stage robust optimisation model within a finite planning horizon, which incorporates material consumption uncertainty through a budget uncertainty set. In the first stage of the two-stage robust optimisation model, activity scheduling is determined before observing any uncertainty. In the second stage, the supply and holding decisions of materials are made based on the first-stage decisions and the uncertain parameter values. The model seeks to minimise the difference between the first-stage delay penalties and early completion rewards, as well as the worst-case acquisition and holding costs in the second stage. To obtain robust solutions, we formulate and prove an equivalent mixed-integer linear programming model based on the structure of the uncertainty set and the recourse function of the two-stage robust optimisation model. Finally, we compare the two-stage robust optimisation model with its deterministic and two-stage stochastic counterparts using the average and 90% percentile costs, and discuss the performance of an extended model that captures both the activity duration time and material consumption uncertainties.

Authors

Institutions

Publication Details

Journal
Journal of the Operational Research Society
Published
2026-10-29
DOI
https://doi.org/10.1080/01605682.2026.2744408
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Two-stage robust project scheduling with material requirement planning

Jiahao Sheng, Jia Shu
2 links
Journal of the Operational Research Society
Resource-Constrained Project Scheduling
article

Two-stage robust project scheduling with material requirement planning

Jiahao Sheng, Jia Shu
article en

Abstract

The primary objective of project scheduling is to provide a guideline for the successful completion of a project. Material requirement planning is also a crucial aspect because the cost of materials constitutes a significant proportion of the total project investment, and project activities cannot proceed without them. This paper aims to integrate these two components using a static two-stage robust optimisation model within a finite planning horizon, which incorporates material consumption uncertainty through a budget uncertainty set. In the first stage of the two-stage robust optimisation model, activity scheduling is determined before observing any uncertainty. In the second stage, the supply and holding decisions of materials are made based on the first-stage decisions and the uncertain parameter values. The model seeks to minimise the difference between the first-stage delay penalties and early completion rewards, as well as the worst-case acquisition and holding costs in the second stage. To obtain robust solutions, we formulate and prove an equivalent mixed-integer linear programming model based on the structure of the uncertainty set and the recourse function of the two-stage robust optimisation model. Finally, we compare the two-stage robust optimisation model with its deterministic and two-stage stochastic counterparts using the average and 90% percentile costs, and discuss the performance of an extended model that captures both the activity duration time and material consumption uncertainties.

Journal of the Operational Research Society
University of Electronic Science and Technology of China (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 10%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon