Post-Earthquake Inspection Zoning of Buried Pipelines in Liquefiable Ground Based on Manhole Uplift

Abstract Rapid post-earthquake inspection of buried pipelines in liquefiable ground is difficult because damage is concealed, whereas manhole uplift H can be measured at the surface. This study develops a three-level inspection-zoning method that links this visible field indicator to the internal response of an adjacent buried steel pipe. A coupled FLAC3D model was established for the manhole–pipeline–soil system, including pore-pressure accumulation, degradation of pipe–soil restraint, manhole–soil slip, and load transfer through the manhole–pipeline connection. The model reproduced a field case with approximately 0.50 m uplift; the calculated uplift was 0.553 m, a difference of 10.6%. Twenty-four analyses combined six pulse-like or non-pulse-like records with peak ground accelerations of 0.1–0.4 g. At 0.4 g, pulse-like motions produced a mean uplift of 0.585 m, 2.1 times the non-pulse-like mean of 0.280 m, while the corresponding mean maximum axial strains were 1.073 × 10⁻³ and 0.856 × 10⁻³. Across all cases, H and maximum pipeline axial strain were positively associated (Pearson r = 0.888; Spearman ρ = 0.883), but strain localization depended additionally on liquefied-zone boundaries and transient deformation compatibility. Accordingly, H is not used to invert actual strain. Instead, case-specific reference boundaries of 0.30 and 0.64 m define routine patrol, review, and priority-inspection zones, with leakage, pressure anomalies, pavement cracking, and joint offset used as escalation criteria. The resulting field chart provides a rapid, observable basis for allocating inspection resources after an earthquake.

Authors

Institutions

Publication Details

Journal
Research Square
Published
2026-10-29
DOI
https://doi.org/10.21203/rs.3.rs-11049472/v1
Primary Topic
Geotechnical Engineering and Underground Structures
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
preprint

Post-Earthquake Inspection Zoning of Buried Pipelines in Liquefiable Ground Based on Manhole Uplift

Jiasheng Jiang, Qingyun Xu, 波 宋, 克武 张
Research Square
Geotechnical Engineering and Underground Structures
preprint

Post-Earthquake Inspection Zoning of Buried Pipelines in Liquefiable Ground Based on Manhole Uplift

Jiasheng Jiang, Qingyun Xu, 波 宋, 克武 张
preprint en

Abstract

Abstract Rapid post-earthquake inspection of buried pipelines in liquefiable ground is difficult because damage is concealed, whereas manhole uplift H can be measured at the surface. This study develops a three-level inspection-zoning method that links this visible field indicator to the internal response of an adjacent buried steel pipe. A coupled FLAC3D model was established for the manhole–pipeline–soil system, including pore-pressure accumulation, degradation of pipe–soil restraint, manhole–soil slip, and load transfer through the manhole–pipeline connection. The model reproduced a field case with approximately 0.50 m uplift; the calculated uplift was 0.553 m, a difference of 10.6%. Twenty-four analyses combined six pulse-like or non-pulse-like records with peak ground accelerations of 0.1–0.4 g. At 0.4 g, pulse-like motions produced a mean uplift of 0.585 m, 2.1 times the non-pulse-like mean of 0.280 m, while the corresponding mean maximum axial strains were 1.073 × 10⁻³ and 0.856 × 10⁻³. Across all cases, H and maximum pipeline axial strain were positively associated (Pearson r = 0.888; Spearman ρ = 0.883), but strain localization depended additionally on liquefied-zone boundaries and transient deformation compatibility. Accordingly, H is not used to invert actual strain. Instead, case-specific reference boundaries of 0.30 and 0.64 m define routine patrol, review, and priority-inspection zones, with leakage, pressure anomalies, pavement cracking, and joint offset used as escalation criteria. The resulting field chart provides a rapid, observable basis for allocating inspection resources after an earthquake.

Research Square
University of Science and Technology Beijing (CN)
Sustainable cities and communities, Industry, innovation and infrastructure
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Post-Earthquake Inspection Zoning of Buried Pipelines in Liquefiable Ground Based on Manhole Uplift — Jiasheng Jiang, Qingyun Xu, et al. · Research Square (2026) | TGRS Research Map | TGRS