Application of Project-Management Maturity for Indian Defence Construction: A Review of Current Procedures and Preliminary Analysis Towards an Improved Framework

Indian defence construction works are delivered through detailed procedures for planning, tendering and contract administration by Military Engineer Services (MES). The existence of detailed procedures does not imply that sound project management practices are being applied and continued improvement achieved in performance from project to project. This interim paper reviews project management maturity models, construction-specific maturity studies, research on knowledgemanagement in organisations, the Defence Works Procedure (DWP) 2020, the IAFW-2249 contract conditions and public United States Army Corps of Engineers (USACE) guidance as a comparator. The paper asks what maturity assessment questions should be applied for MES and examined in detail as an initial step towards framing a workable maturity-based framework for this organisation. The review has focused on research relevant to the particular organisational and working environment of MES. Anonymised selected data keeping in view of the security restrictions which gives general indication towards the maturity dimensions has been collated for purpose of review. These indicators provide starting evidence to be tested in detail during Stage II of research and do not prove organisational immaturity in this Stage. The paper proposes nine identifiable candidate capability dimensions which are to be examined for evolving a final maturity-based framework and outlines proposed steps for next research stage.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-10-28
DOI
https://doi.org/10.5281/zenodo.23727587
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Project-Management Maturity for Indian Defence Construction: A Review of Current Procedures and Preliminary Analysis Towards an Improved Framework

Dr. Gaurav Vispute Alex Paul Thomas
1 links
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Application of Project-Management Maturity for Indian Defence Construction: A Review of Current Procedures and Preliminary Analysis Towards an Improved Framework

Dr. Gaurav Vispute Alex Paul Thomas
article en

Abstract

Indian defence construction works are delivered through detailed procedures for planning, tendering and contract administration by Military Engineer Services (MES). The existence of detailed procedures does not imply that sound project management practices are being applied and continued improvement achieved in performance from project to project. This interim paper reviews project management maturity models, construction-specific maturity studies, research on knowledgemanagement in organisations, the Defence Works Procedure (DWP) 2020, the IAFW-2249 contract conditions and public United States Army Corps of Engineers (USACE) guidance as a comparator. The paper asks what maturity assessment questions should be applied for MES and examined in detail as an initial step towards framing a workable maturity-based framework for this organisation. The review has focused on research relevant to the particular organisational and working environment of MES. Anonymised selected data keeping in view of the security restrictions which gives general indication towards the maturity dimensions has been collated for purpose of review. These indicators provide starting evidence to be tested in detail during Stage II of research and do not prove organisational immaturity in this Stage. The paper proposes nine identifiable candidate capability dimensions which are to be examined for evolving a final maturity-based framework and outlines proposed steps for next research stage.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Openalex Percentile: Top 10%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon