A Literature Review on Automated Construction Progress Verification Based on BIM and UAV Vision

Construction progress verification is a core task in engineering management, but traditional manual inspection is inefficient, lagging, and subjective, and carries safety risks. This paper, through a method of literature review, explores how the integration of Building Information Modeling (BIM) and unmanned aerial vehicle (UAV) vision can automate construction progress verification. Based on 24 listed studies, the review organizes the field around three fundamental problems: how site data are acquired, how data are converted and aligned with BIM, and how progress is automatically identified. It finds that point-cloud registration identifies components with accuracy above 95% in a bridge case, a deep-learning study obtains [email protected] of 0.989, and a wind-solar-storage project reports about 400% higher acquisition efficiency with early-warning response within one hour. The paper concludes that the technology has moved from manual assistance to automated monitoring, yet the transition from progress monitoring to compliance-based verification remains unresolved, and future work should move toward digital twin closure, multi-modal fusion, and edge intelligence.

Authors

Institutions

Publication Details

Journal
Applied and Computational Engineering
Published
2026-10-27
DOI
https://doi.org/10.54254/2755-2721/2026.38201
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Literature Review on Automated Construction Progress Verification Based on BIM and UAV Vision

Chenyi Lu
Applied and Computational Engineering
BIM and Construction Integration
article

A Literature Review on Automated Construction Progress Verification Based on BIM and UAV Vision

Chenyi Lu
article en

Abstract

Construction progress verification is a core task in engineering management, but traditional manual inspection is inefficient, lagging, and subjective, and carries safety risks. This paper, through a method of literature review, explores how the integration of Building Information Modeling (BIM) and unmanned aerial vehicle (UAV) vision can automate construction progress verification. Based on 24 listed studies, the review organizes the field around three fundamental problems: how site data are acquired, how data are converted and aligned with BIM, and how progress is automatically identified. It finds that point-cloud registration identifies components with accuracy above 95% in a bridge case, a deep-learning study obtains [email protected] of 0.989, and a wind-solar-storage project reports about 400% higher acquisition efficiency with early-warning response within one hour. The paper concludes that the technology has moved from manual assistance to automated monitoring, yet the transition from progress monitoring to compliance-based verification remains unresolved, and future work should move toward digital twin closure, multi-modal fusion, and edge intelligence.

Applied and Computational EngineeringVol. 277(1)
Zhejiang A & F University (CN)
Industry, innovation and infrastructure, Sustainable cities and communities
Openalex Percentile: Top 16%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
A Literature Review on Automated Construction Progress Verification Based on BIM and UAV Vision — Chenyi Lu · Applied and Computational Engineering (2026) | TGRS Research Map | TGRS