Unified heuristic optimization (UHO) for scheduling repetitive and nonrepetitive construction and renewal projects

Purpose Traditional Critical Path Method (CPM) based heuristics are insufficient for managing resource overallocation and meeting deadlines in repetitive projects such as highways and multi-bridge repairs. Despite their inefficiencies, they are still being used due to the lack of simple heuristic scheduling tools that help project managers and stakeholders cater to these projects' needs, such as crew continuity. The study aims to fill this gap and develop a unified framework that extends CPM heuristics to optimize scheduling for both repetitive and nonrepetitive projects. Design/methodology/approach A unified heuristic optimization (UHO) framework was developed, integrating CPM-based cost-resource allocation and time-cost trade-off procedures with the first-come-first-served repetitive scheduling methodology. An Excel-based automated scheduling tool based on the proposed framework was developed as a proof of concept and tested against cases from the literature. Findings This article presented a novel scheduling framework that generalizes CPM procedures to be applicable for repetitive projects, resolving any deadline or resource allocation constraints. Applied to a literature case study, the produced schedule achieved the same overall project deadline while having more efficient resource utilization. Originality/value This study introduces a unified heuristic approach that simplifies and enhances scheduling for repetitive infrastructure projects. By bridging the gap between CPM-based tools and the unique demands of repetitive scheduling, it supports project managers in managing the schedule and resources of large-scale repetitive projects.

Authors

Institutions

Publication Details

Journal
Built Environment Project and Asset Management
Published
2026-10-27
DOI
https://doi.org/10.1108/bepam-11-2025-0356
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Unified heuristic optimization (UHO) for scheduling repetitive and nonrepetitive construction and renewal projects

Saidat Ojulari, Kareem Mostafa, Tarek Hegazy
Built Environment Project and Asset Management
Resource-Constrained Project Scheduling
article

Unified heuristic optimization (UHO) for scheduling repetitive and nonrepetitive construction and renewal projects

Saidat Ojulari, Kareem Mostafa, Tarek Hegazy
article en

Abstract

Purpose Traditional Critical Path Method (CPM) based heuristics are insufficient for managing resource overallocation and meeting deadlines in repetitive projects such as highways and multi-bridge repairs. Despite their inefficiencies, they are still being used due to the lack of simple heuristic scheduling tools that help project managers and stakeholders cater to these projects' needs, such as crew continuity. The study aims to fill this gap and develop a unified framework that extends CPM heuristics to optimize scheduling for both repetitive and nonrepetitive projects. Design/methodology/approach A unified heuristic optimization (UHO) framework was developed, integrating CPM-based cost-resource allocation and time-cost trade-off procedures with the first-come-first-served repetitive scheduling methodology. An Excel-based automated scheduling tool based on the proposed framework was developed as a proof of concept and tested against cases from the literature. Findings This article presented a novel scheduling framework that generalizes CPM procedures to be applicable for repetitive projects, resolving any deadline or resource allocation constraints. Applied to a literature case study, the produced schedule achieved the same overall project deadline while having more efficient resource utilization. Originality/value This study introduces a unified heuristic approach that simplifies and enhances scheduling for repetitive infrastructure projects. By bridging the gap between CPM-based tools and the unique demands of repetitive scheduling, it supports project managers in managing the schedule and resources of large-scale repetitive projects.

Built Environment Project and Asset Management
University of Waterloo (CA)
Industry, innovation and infrastructure
Openalex Percentile: Top 10%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Unified heuristic optimization (UHO) for scheduling repetitive and nonrepetitive construction and renewal projects — Saidat Ojulari, Kareem Mostafa, et al. · Built Environment Project and Asset Management (2026) | TGRS Research Map | TGRS