Exact hard-budget allocations for zero-error cluster audits: Two capacities and two costs
This technical note studies one-shot audits without replacement of fixed prediction tables when labels are reviewed by whole article and every realized sample obeys a hard cost cap. For two known article capacities s L example requiring three count types. The error vector is fixed and arbitrary. Whole-article review is assumed reliable, and capacities and costs are known before sampling. The results are explicit structured calculations within the established capacity-cover audit framework.
Authors
- Zihuan Xu
Institutions
- Capital Normal University (CN)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-10-27
- DOI
- https://doi.org/10.5281/zenodo.23680074
- Primary Topic
- Survey Sampling and Estimation Techniques
- Type
- article
- Field-Weighted Citation Impact
- 0.00