Hearing the Silence: Early Warning Signals in Megaproject Portfolios

Early warning signals are well developed for individual projects but absent at the portfolio level, where uncertainties are routinely flagged yet rarely linked to corrective control, a signal without response pathology. Through a 2-year embedded case study of a megaproject portfolio, this article extends early warning signal theory from project to portfolio, specifying three requirements that distinguish a portfolio signal: portfolio-native, mechanism traceable, and time-lagged to the horizon of portfolio-level levers. Six content-validated leading indicators operationalize the governance drivers of portfolio success; one indicator—proportion ahead of required date (PARD)—is operationally tested, bridging sensing capacity and corrective action in megaproject portfolios.

Authors

Institutions

Publication Details

Journal
Project Management Journal
Published
2026-10-26
DOI
https://doi.org/10.1177/87569728261497602
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hearing the Silence: Early Warning Signals in Megaproject Portfolios

Haavard Haaskjold, Bassam Hussein, Thomas Tepstad Berge
Project Management Journal
Construction Project Management and Performance
article

Hearing the Silence: Early Warning Signals in Megaproject Portfolios

Haavard Haaskjold, Bassam Hussein, Thomas Tepstad Berge
article en

Abstract

Early warning signals are well developed for individual projects but absent at the portfolio level, where uncertainties are routinely flagged yet rarely linked to corrective control, a signal without response pathology. Through a 2-year embedded case study of a megaproject portfolio, this article extends early warning signal theory from project to portfolio, specifying three requirements that distinguish a portfolio signal: portfolio-native, mechanism traceable, and time-lagged to the horizon of portfolio-level levers. Six content-validated leading indicators operationalize the governance drivers of portfolio success; one indicator—proportion ahead of required date (PARD)—is operationally tested, bridging sensing capacity and corrective action in megaproject portfolios.

Project Management Journal
Norwegian University of Science and Technology (NO)
Openalex Percentile: Top 10%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon