A Readiness Model for Integrated Project Delivery

Abstract As the construction industry continues to embrace integrated project delivery (IPD) for its widely recognized benefits and efficiency improvements, the number of projects utilizing this approach is growing. Despite this trend, IPD represents a significant departure from the traditional, less collaborative, and less integrated methods that have long dominated the industry. Consequently, practical experience with IPD remains in development. Therefore, a readiness model to evaluate project-team readiness to implement IPD becomes essential in order to target and develop the necessary capabilities. To address this gap, this paper introduces and preliminarily evaluates a project-level IPD readiness model and assessment tool that provides a detailed picture of readiness across IPD capabilities and helps set clear expectations for project stakeholders. The model supports early-stage IPD implementation planning by offering a structured approach to assessing and improving readiness, ensuring that teams, resources, and plans are aligned with the collaborative and integrative demands of IPD. Guided by design science research (DSR) principles, the methodology integrates a thorough understanding of existing gaps, leverages prior knowledge, and then develops and refines the readiness assessment tool, complemented by a case-based application and preliminary evaluation step through two case studies. The Readiness Model includes two main components: an IPD Readiness Framework and an IPD Readiness Assessment Tool that classifies project readiness into five levels—emergent, low, moderate, high, and optimal—providing a structured path for assessing and advancing IPD project preparedness. This model lays the foundation for more standardized and consistent IPD implementation, ultimately contributing to its optimization as a collaborative approach within the construction industry.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2026-10-26
DOI
https://doi.org/10.1061/jcemd4.coeng-17714
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Readiness Model for Integrated Project Delivery

Érik Poirier, Sheryl Staub‐French, Ahmad J. Arar
Journal of Construction Engineering and Management
Construction Project Management and Performance
article

A Readiness Model for Integrated Project Delivery

Érik Poirier, Sheryl Staub‐French, Ahmad J. Arar
article en

Abstract

Abstract As the construction industry continues to embrace integrated project delivery (IPD) for its widely recognized benefits and efficiency improvements, the number of projects utilizing this approach is growing. Despite this trend, IPD represents a significant departure from the traditional, less collaborative, and less integrated methods that have long dominated the industry. Consequently, practical experience with IPD remains in development. Therefore, a readiness model to evaluate project-team readiness to implement IPD becomes essential in order to target and develop the necessary capabilities. To address this gap, this paper introduces and preliminarily evaluates a project-level IPD readiness model and assessment tool that provides a detailed picture of readiness across IPD capabilities and helps set clear expectations for project stakeholders. The model supports early-stage IPD implementation planning by offering a structured approach to assessing and improving readiness, ensuring that teams, resources, and plans are aligned with the collaborative and integrative demands of IPD. Guided by design science research (DSR) principles, the methodology integrates a thorough understanding of existing gaps, leverages prior knowledge, and then develops and refines the readiness assessment tool, complemented by a case-based application and preliminary evaluation step through two case studies. The Readiness Model includes two main components: an IPD Readiness Framework and an IPD Readiness Assessment Tool that classifies project readiness into five levels—emergent, low, moderate, high, and optimal—providing a structured path for assessing and advancing IPD project preparedness. This model lays the foundation for more standardized and consistent IPD implementation, ultimately contributing to its optimization as a collaborative approach within the construction industry.

Journal of Construction Engineering and ManagementVol. 153(1)
University of British Columbia (CA), École de Technologie Supérieure (CA)
Openalex Percentile: Top 10%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon