Stochastic multi-objective optimal placement and sizing of distributed generation in multi-microgrid systems using enhanced modified spider wasp optimization

The incorporation of Distributed Generation (DG) units into Multi-Microgrid (MMG) systems has significantly enhanced the operational flexibility, reliability and economic efficiency of modern smart grids. The nonlinear, constrained and stochastic nature of the optimization problem, in addition to the multi-objective nature, makes the determination of the optimum location and size of a DG unit a challenging task. In this paper, Enhanced Modified Spider Wasp Optimization (EMSWO) algorithm is proposed for the stochastic placement and sizing of DGs in interconnected MMGs. In order to promote population diversity, fasten convergence speed, avoid premature convergence and meet the network operation constraints, chaotic population initialization, adaptive exploration–exploitation strategy, elite preservation, repair-based constraint handling mechanism are proposed for the proposed EMSWO. The proposed stochastic planning framework aims at minimizing the Total Present Worth (TPW) and Levelized Cost of Energy (LCOE) while simultaneously meeting power balance, voltage deviation, DG penetration, and generation capacity constraints. Using Monte Carlo simulation, uncertainties in load demand, renewable generation and electricity prices are captured, and a scenario reduction technique is used to maintain the statistical properties in a lower dimensional space with less computational effort. The proposed EMSWO is tested on a benchmark MMG system for different operating scenarios. The simulation results show that the obtained TPW is reduced from 434.25 million USD to 404.52 million USD and LCOE is reduced to 0.174 USD/kWh which is better than the conventional Spider Wasp Optimization (SWO), Grey Wolf Optimization (GWO), Cyclonic Convergent Particle Swarm Optimization (CCPSO) and Particle Swarm Optimization (PSO). In addition, the convergence and statistical results validate that the proposed EMSWO results in faster convergence, more stable solutions, better voltage profile and lower operating cost, which proves its effectiveness as a solid optimization framework for stochastic DG planning in interconnected MMG networks.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2026-10-26
DOI
https://doi.org/10.1038/s41598-026-75756-x
Primary Topic
Optimal Power Flow Distribution
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stochastic multi-objective optimal placement and sizing of distributed generation in multi-microgrid systems using enhanced modified spider wasp optimization

Abdulaziz Mohammed Mukhlef Alanazi, Ali M. Elrashidi, Ch. Rami Reddy, Sri Suresh Mavuri et al.
Scientific Reports
Optimal Power Flow Distribution
article

Stochastic multi-objective optimal placement and sizing of distributed generation in multi-microgrid systems using enhanced modified spider wasp optimization

Abdulaziz Mohammed Mukhlef Alanazi, Ali M. Elrashidi, Ch. Rami Reddy, Sri Suresh Mavuri, D. Ravi Kumar
article en

Abstract

The incorporation of Distributed Generation (DG) units into Multi-Microgrid (MMG) systems has significantly enhanced the operational flexibility, reliability and economic efficiency of modern smart grids. The nonlinear, constrained and stochastic nature of the optimization problem, in addition to the multi-objective nature, makes the determination of the optimum location and size of a DG unit a challenging task. In this paper, Enhanced Modified Spider Wasp Optimization (EMSWO) algorithm is proposed for the stochastic placement and sizing of DGs in interconnected MMGs. In order to promote population diversity, fasten convergence speed, avoid premature convergence and meet the network operation constraints, chaotic population initialization, adaptive exploration–exploitation strategy, elite preservation, repair-based constraint handling mechanism are proposed for the proposed EMSWO. The proposed stochastic planning framework aims at minimizing the Total Present Worth (TPW) and Levelized Cost of Energy (LCOE) while simultaneously meeting power balance, voltage deviation, DG penetration, and generation capacity constraints. Using Monte Carlo simulation, uncertainties in load demand, renewable generation and electricity prices are captured, and a scenario reduction technique is used to maintain the statistical properties in a lower dimensional space with less computational effort. The proposed EMSWO is tested on a benchmark MMG system for different operating scenarios. The simulation results show that the obtained TPW is reduced from 434.25 million USD to 404.52 million USD and LCOE is reduced to 0.174 USD/kWh which is better than the conventional Spider Wasp Optimization (SWO), Grey Wolf Optimization (GWO), Cyclonic Convergent Particle Swarm Optimization (CCPSO) and Particle Swarm Optimization (PSO). In addition, the convergence and statistical results validate that the proposed EMSWO results in faster convergence, more stable solutions, better voltage profile and lower operating cost, which proves its effectiveness as a solid optimization framework for stochastic DG planning in interconnected MMG networks.

Scientific Reports
Northern Border University (SA), University of Business and Technology (SA)
Openalex Percentile: Top 24%
Optimal Power Flow Distribution
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon