Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects

Cost escalation in megaprojects is frequently recorded as a project-controls problem although a material proportion of its antecedents originates outside the conventional cost ledger: in supplier capacity, procurement decisions, fabrication readiness, delivery uncertainty and poorly sequenced site work. This integrative review examines how construction supply chain management (CSCM) can be connected to project controls to improve the timeliness and reliability of cost decisions. Thirty DOI-identifiable publications dated 2020–2025 provide the core analytical literature, complemented by critical examination of the managerial mechanisms linking procurement and production information to schedule and cost forecasts. The review adopts thematic synthesis rather than a statistical meta-analysis because the publications differ in design, context and outcome measures. Four interdependent mechanisms emerge: a common work-package data structure; supplier-informed lookahead and change control; reconciliation of earned value, commitments and remaining exposure; and governance that assigns accountability for corrective action. An integrated control architecture and an explicitly hypothetical, internally reconciled numerical example illustrate how cost signals can change when upstream commitments and schedule consequences become visible. The argument is not that technology independently creates savings, but that decision quality improves when trusted supply-chain evidence is translated into actionable project forecasts. The paper develops research propositions and a validation agenda for complex, multi-contractor delivery environments, while identifying contractual, data-quality and organizational conditions under which integration may fail.

Authors

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-10-26
DOI
https://doi.org/10.64388/irev10i4-1724332
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects

Samhar Samoon
Iconic Research and Engineering Journals
Construction Project Management and Performance
article

Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects

Samhar Samoon
article en

Abstract

Cost escalation in megaprojects is frequently recorded as a project-controls problem although a material proportion of its antecedents originates outside the conventional cost ledger: in supplier capacity, procurement decisions, fabrication readiness, delivery uncertainty and poorly sequenced site work. This integrative review examines how construction supply chain management (CSCM) can be connected to project controls to improve the timeliness and reliability of cost decisions. Thirty DOI-identifiable publications dated 2020–2025 provide the core analytical literature, complemented by critical examination of the managerial mechanisms linking procurement and production information to schedule and cost forecasts. The review adopts thematic synthesis rather than a statistical meta-analysis because the publications differ in design, context and outcome measures. Four interdependent mechanisms emerge: a common work-package data structure; supplier-informed lookahead and change control; reconciliation of earned value, commitments and remaining exposure; and governance that assigns accountability for corrective action. An integrated control architecture and an explicitly hypothetical, internally reconciled numerical example illustrate how cost signals can change when upstream commitments and schedule consequences become visible. The argument is not that technology independently creates savings, but that decision quality improves when trusted supply-chain evidence is translated into actionable project forecasts. The paper develops research propositions and a validation agenda for complex, multi-contractor delivery environments, while identifying contractual, data-quality and organizational conditions under which integration may fail.

Iconic Research and Engineering JournalsVol. 10(4)
Openalex Percentile: Top 10%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon