Survey-based uncertainty assessment and FEINN prediction in Indian construction projects

The Indian construction industry plays an important role in economic growth but faces delays, cost overruns, and performance inefficiencies due to uncertainties in material availability, labour, regulations, and environmental conditions. This manuscript presents a survey-based assessment of key uncertainty factors affecting construction project performance in India and develops a predictive model based on the identified factors. A structured questionnaire, developed from an extensive literature review, was administered to 50 engineers at a leading Indian construction firm, achieving a 90% response rate. Exploratory factor analysis (EFA), Kaiser–Meyer–Olkin, and Bartlett’s test were employed to identify and validate the major uncertainty dimensions. The novelty lies in integrating statistically validated uncertainty dimensions extracted through EFA with a finite element interpolated neural network (FEINN)-based predictive framework, combining interpretable survey analytics with non-linear project performance prediction. The research uncovers major uncertainty dimensions including financial instability, labour shortages, material availability, and regulatory delays. The FEINN model achieved a lower prediction error with a root mean squared error of 0.12 and mean absolute error of 0.07, and a mean absolute percentage error of 2.7%, outperforming benchmarks. This approach offers valuable insights to enhance decision making and improve project outcomes across the Indian construction sector.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction
Published
2026-10-24
DOI
https://doi.org/10.1680/jsmic.25.00034
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Survey-based uncertainty assessment and FEINN prediction in Indian construction projects

K Vasugi, Pregina K
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction
Construction Project Management and Performance
article

Survey-based uncertainty assessment and FEINN prediction in Indian construction projects

K Vasugi, Pregina K
article en

Abstract

The Indian construction industry plays an important role in economic growth but faces delays, cost overruns, and performance inefficiencies due to uncertainties in material availability, labour, regulations, and environmental conditions. This manuscript presents a survey-based assessment of key uncertainty factors affecting construction project performance in India and develops a predictive model based on the identified factors. A structured questionnaire, developed from an extensive literature review, was administered to 50 engineers at a leading Indian construction firm, achieving a 90% response rate. Exploratory factor analysis (EFA), Kaiser–Meyer–Olkin, and Bartlett’s test were employed to identify and validate the major uncertainty dimensions. The novelty lies in integrating statistically validated uncertainty dimensions extracted through EFA with a finite element interpolated neural network (FEINN)-based predictive framework, combining interpretable survey analytics with non-linear project performance prediction. The research uncovers major uncertainty dimensions including financial instability, labour shortages, material availability, and regulatory delays. The FEINN model achieved a lower prediction error with a root mean squared error of 0.12 and mean absolute error of 0.07, and a mean absolute percentage error of 2.7%, outperforming benchmarks. This approach offers valuable insights to enhance decision making and improve project outcomes across the Indian construction sector.

Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction
Vellore Institute of Technology University (IN)
Openalex Percentile: Top 9%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon