Schedule-Informed Empty-Vehicle Dispatching for OHT Systems in Semiconductor Manufacturing

Overhead hoist transport (OHT) performance affects the execution of semiconductor production schedules because transport delays postpone subsequent operations. This study develops the Scheduler and OHT Allocation Monitoring Simulator (SOMOS), an event-driven environment that integrates machine processing, transport request generation, OHT movement, and subsequent production execution. Based on SOMOS, we propose Schedule-informed Empty-Vehicle Dispatching (SEVD), which repositions idle OHT vehicles before pickup requests occur using immediate pickup demand, remaining processing information, and a schedule-derived spatial demand prior. SEVD retains the conventional HUNGARIAN assignment procedure for actual requests. Experiments compare SEVD with six benchmark dispatching methods over 20 paired seeds. Relative to HUNGARIAN assignment, SEVD reduces the mean post-assignment empty-approach travel from 96.82 s to 71.23 s and source wait p90 from 428.74 s to 399.34 s while maintaining production-level performance comparable to the strongest benchmarks. These gains are obtained by redistributing vehicle movement toward proactive repositioning, with total empty travel increasing by 17.8% and total travel distance by 6.8%. Fleet size and ablation experiments further show that the clearest benefit is associated with proactive spatial repositioning rather than precise temporal prediction. These results support interpreting SEVD as a framework for the proactive spatial repositioning of idle vehicles, while the incremental contribution of schedule-derived information was not statistically detectable in the present testbed.

Authors

Institutions

Publication Details

Journal
Systems
Published
2026-10-22
DOI
https://doi.org/10.3390/systems14111336
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Schedule-Informed Empty-Vehicle Dispatching for OHT Systems in Semiconductor Manufacturing

Seongjun Yu, In-Beom Park, Kwanho Kim, Hyojin Ahn et al.
Systems
Advanced Manufacturing and Logistics Optimization
article

Schedule-Informed Empty-Vehicle Dispatching for OHT Systems in Semiconductor Manufacturing

Seongjun Yu, In-Beom Park, Kwanho Kim, Hyojin Ahn, Jihoon Bae, Jungwoo Ahn
article en

Abstract

Overhead hoist transport (OHT) performance affects the execution of semiconductor production schedules because transport delays postpone subsequent operations. This study develops the Scheduler and OHT Allocation Monitoring Simulator (SOMOS), an event-driven environment that integrates machine processing, transport request generation, OHT movement, and subsequent production execution. Based on SOMOS, we propose Schedule-informed Empty-Vehicle Dispatching (SEVD), which repositions idle OHT vehicles before pickup requests occur using immediate pickup demand, remaining processing information, and a schedule-derived spatial demand prior. SEVD retains the conventional HUNGARIAN assignment procedure for actual requests. Experiments compare SEVD with six benchmark dispatching methods over 20 paired seeds. Relative to HUNGARIAN assignment, SEVD reduces the mean post-assignment empty-approach travel from 96.82 s to 71.23 s and source wait p90 from 428.74 s to 399.34 s while maintaining production-level performance comparable to the strongest benchmarks. These gains are obtained by redistributing vehicle movement toward proactive repositioning, with total empty travel increasing by 17.8% and total travel distance by 6.8%. Fleet size and ablation experiments further show that the clearest benefit is associated with proactive spatial repositioning rather than precise temporal prediction. These results support interpreting SEVD as a framework for the proactive spatial repositioning of idle vehicles, while the incremental contribution of schedule-derived information was not statistically detectable in the present testbed.

SystemsVol. 14(11)
Dongguk University (KR)
Openalex Percentile: Top 12%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Schedule-Informed Empty-Vehicle Dispatching for OHT Systems in Semiconductor Manufacturing — Seongjun Yu, In-Beom Park, et al. · Systems (2026) | TGRS Research Map | TGRS