Pollutant Removal Performance and Operational Responses of a Hybrid Constructed Wetland for Slow-Flowing Waters in the Pinglu Canal, China

Slow-flowing water bodies formed after the cutoff and straightening of large canals have low flow velocity and weak water exchange, allowing nitrogen and phosphorus to accumulate and induce eutrophication. To enhance canal ecological restoration, a hybrid constructed wetland (HCW) system was established in the ecological conservation area of the Pinglu Canal. The system consisted of a grass swale, surface-flow constructed wetland (CW), subsurface-flow CW, and filter, and its performance under different hydraulic conditions and hydraulic retention time (HRT) was evaluated based on the removal of chemical oxygen demand (COD), NH3-N, total nitrogen (TN), and total phosphorus (TP). In the operating-condition comparison, removal rates of all four pollutants were highest during the planted normal-water-level stage. Pollutant removal responses to HRT varied among pollutants and operating conditions and were not consistently monotonic. Considering the observed multi-pollutant removal performance and hydraulic throughput, 48 h was considered a practically suitable HRT under planted normal-water-level conditions within the tested range. Unit contributions varied among pollutants and operating conditions. The subsurface-flow CW mainly contributed to COD removal, the surface-flow CW contributed most to TP removal, and the four units presented functional complementarity. Under the recommended practical conditions (normal-water-level, vegetation, HRT 48 h), removal rates of COD, NH3-N, TN, and TP reached 33%, 91%, 68%, and 58%, respectively. These findings provide preliminary evidence for further evaluation of the tested HCW at the Pinglu Canal study site.

Authors

Institutions

Publication Details

Journal
Water
Published
2026-10-16
DOI
https://doi.org/10.3390/w18202567
Primary Topic
Constructed Wetlands for Wastewater Treatment
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pollutant Removal Performance and Operational Responses of a Hybrid Constructed Wetland for Slow-Flowing Waters in the Pinglu Canal, China

Fei Qi, Han Zhaoxing, Zhiyuan Bao, Hongyan Shen et al.
Water
Constructed Wetlands for Wastewater Treatment
article

Pollutant Removal Performance and Operational Responses of a Hybrid Constructed Wetland for Slow-Flowing Waters in the Pinglu Canal, China

Fei Qi, Han Zhaoxing, Zhiyuan Bao, Hongyan Shen, Jingye Wang, Jie Liu, Dezhi Sun
article en

Abstract

Slow-flowing water bodies formed after the cutoff and straightening of large canals have low flow velocity and weak water exchange, allowing nitrogen and phosphorus to accumulate and induce eutrophication. To enhance canal ecological restoration, a hybrid constructed wetland (HCW) system was established in the ecological conservation area of the Pinglu Canal. The system consisted of a grass swale, surface-flow constructed wetland (CW), subsurface-flow CW, and filter, and its performance under different hydraulic conditions and hydraulic retention time (HRT) was evaluated based on the removal of chemical oxygen demand (COD), NH3-N, total nitrogen (TN), and total phosphorus (TP). In the operating-condition comparison, removal rates of all four pollutants were highest during the planted normal-water-level stage. Pollutant removal responses to HRT varied among pollutants and operating conditions and were not consistently monotonic. Considering the observed multi-pollutant removal performance and hydraulic throughput, 48 h was considered a practically suitable HRT under planted normal-water-level conditions within the tested range. Unit contributions varied among pollutants and operating conditions. The subsurface-flow CW mainly contributed to COD removal, the surface-flow CW contributed most to TP removal, and the four units presented functional complementarity. Under the recommended practical conditions (normal-water-level, vegetation, HRT 48 h), removal rates of COD, NH3-N, TN, and TP reached 33%, 91%, 68%, and 58%, respectively. These findings provide preliminary evidence for further evaluation of the tested HCW at the Pinglu Canal study site.

WaterVol. 18(20)
Beijing Forestry University (CN), Hebei University of Science and Technology (CN), Ministry of Transport (CN)
National Key Research and Development Program of China
Clean water and sanitation, Responsible consumption and production
Openalex Percentile: Top 10%
Constructed Wetlands for Wastewater Treatment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.