Mud Mountain Dam SBT invert liner history and performance

Mud Mountain Dam (MMD) is located on the White River in Washington State, USA, where it receives river sediment derived from Mt. Rainier, a 4,392-m-tall, glaciated, active stratovolcano. MMD is a run-of-river flood control project, where large volumes of silt to boulder-sized material pass through the sediment bypass tunnel (SBT). The resultant mechanical abrasion damages the tunnel invert liner, requiring frequent and expensive maintenance. MMD’s SBT invert liner was constructed in 1942 with steel rails embedded in concrete that required frequent, costly repairs. In 1992, the rail-in-concrete design was replaced with a continuous 2.5-cm thick welded steel plate liner. However, through-going abrasion holes developed in the steel liner within ten years, necessitating annual to bi-annual concrete patching until, in 2018, a 25.4-cm thick granite block invert liner was installed. Granite blocks were placed in 536 rows overlying a porous concrete layer placed atop the older steel liner, and the tunnel was returned to service in November 2018. Between the initial granite liner operation and March 2024, the granite liner experienced flow 47% of the time, or 900 days. Annual inspections tracked the development of concentrated, asymmetrical erosion like that observed in the previous steel liner. Specifically, erosion is concentrated at the inside of the upstream and downstream tunnel bends and the middle of the straight tunnel section. This paper includes a brief history of the MMD SBT, the basis of the granite liner design, recent visual/manual granite liner erosion observations, and a summary LiDAR comparison of as-built (November 2018) and post-operation (October 2023) data.

Authors

Publication Details

Journal
mediaTUM (Technical University of Munich)
Published
2026-10-15
DOI
https://doi.org/10.14459/2026md1861072
Primary Topic
Hydraulic flow and structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mud Mountain Dam SBT invert liner history and performance

Joanna Curran, Richard Smith
mediaTUM (Technical University of Munich)
Hydraulic flow and structures
article

Mud Mountain Dam SBT invert liner history and performance

Joanna Curran, Richard Smith
article en

Abstract

Mud Mountain Dam (MMD) is located on the White River in Washington State, USA, where it receives river sediment derived from Mt. Rainier, a 4,392-m-tall, glaciated, active stratovolcano. MMD is a run-of-river flood control project, where large volumes of silt to boulder-sized material pass through the sediment bypass tunnel (SBT). The resultant mechanical abrasion damages the tunnel invert liner, requiring frequent and expensive maintenance. MMD’s SBT invert liner was constructed in 1942 with steel rails embedded in concrete that required frequent, costly repairs. In 1992, the rail-in-concrete design was replaced with a continuous 2.5-cm thick welded steel plate liner. However, through-going abrasion holes developed in the steel liner within ten years, necessitating annual to bi-annual concrete patching until, in 2018, a 25.4-cm thick granite block invert liner was installed. Granite blocks were placed in 536 rows overlying a porous concrete layer placed atop the older steel liner, and the tunnel was returned to service in November 2018. Between the initial granite liner operation and March 2024, the granite liner experienced flow 47% of the time, or 900 days. Annual inspections tracked the development of concentrated, asymmetrical erosion like that observed in the previous steel liner. Specifically, erosion is concentrated at the inside of the upstream and downstream tunnel bends and the middle of the straight tunnel section. This paper includes a brief history of the MMD SBT, the basis of the granite liner design, recent visual/manual granite liner erosion observations, and a summary LiDAR comparison of as-built (November 2018) and post-operation (October 2023) data.

mediaTUM (Technical University of Munich)
Industry, innovation and infrastructure
Openalex Percentile: Top 19%
Hydraulic flow and structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines