Building and Sustaining: The Unfinished Medina-Mecca Extension of the Ottoman Hijaz Telegraph Line (1900-1904)

The Salt-Medina-Mecca telegraph project began in 1900 with the aim of building a continuous overland connection under Ottoman administrative control and reducing reliance on the foreign submarine cable via Jeddah. However, the project was stalled before completion and this article examines why work on the Medina-Mecca extension initially stalled and why it remained unfinished. Drawing chiefly on official Ottoman records, the study uses the Salt-Medina line, completed in 1901, as a comparative baseline. The stoppage arose under three conditions: implementation depended on action through both the Hijaz provincial administration and the Emirate of Mecca; secure passage could not be ensured; and construction parties came under attack. Yet attacks alone do not explain prolonged non-completion. Despite repeated damage, the Salt-Medina line remained in service through renewed arrangements for protection, provisioning, transport, salaries, tribal allowances, mediation and repair. Comparable arrangements could not be established and sustained for the extension on the required scale and on dependable terms. Without attributing particular attacks to direct orders from the governor or the Emir, the article argues that political obstruction mattered insofar as it could operate through these vulnerable arrangements.

Authors

Institutions

Publication Details

Journal
Kadim
Published
2026-10-15
DOI
https://doi.org/10.54462/kadim.1927993
Primary Topic
Historical Turkish Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Building and Sustaining: The Unfinished Medina-Mecca Extension of the Ottoman Hijaz Telegraph Line (1900-1904)

Ömer Faruk CAN
Kadim
Historical Turkish Studies
article

Building and Sustaining: The Unfinished Medina-Mecca Extension of the Ottoman Hijaz Telegraph Line (1900-1904)

Ömer Faruk CAN
article en

Abstract

The Salt-Medina-Mecca telegraph project began in 1900 with the aim of building a continuous overland connection under Ottoman administrative control and reducing reliance on the foreign submarine cable via Jeddah. However, the project was stalled before completion and this article examines why work on the Medina-Mecca extension initially stalled and why it remained unfinished. Drawing chiefly on official Ottoman records, the study uses the Salt-Medina line, completed in 1901, as a comparative baseline. The stoppage arose under three conditions: implementation depended on action through both the Hijaz provincial administration and the Emirate of Mecca; secure passage could not be ensured; and construction parties came under attack. Yet attacks alone do not explain prolonged non-completion. Despite repeated damage, the Salt-Medina line remained in service through renewed arrangements for protection, provisioning, transport, salaries, tribal allowances, mediation and repair. Comparable arrangements could not be established and sustained for the extension on the required scale and on dependable terms. Without attributing particular attacks to direct orders from the governor or the Emir, the article argues that political obstruction mattered insofar as it could operate through these vulnerable arrangements.

Kadim(12)
Sakarya University (TR)
Industry, innovation and infrastructure, Peace, justice, and strong institutions
Openalex Percentile: Top 4%
Historical Turkish Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.