Analysis of construction response for mechanized construction of metro connecting passages

To investigate the influence of mechanized pipe jacking construction for connecting passages in weathered granite strata on the settlement and deformation of left and right shield sections of metro tunnels and ground surface, this paper takes the pipe jacking project of No.1 connecting passage in a typical weathered granite stratum as the research background. Numerical analysis software was used to model and analyze the whole construction process of the connecting passage using the mechanized pipe jacking method. The accuracy of the numerical model was verified by comparison with field monitoring data. On this basis, the influence laws of stratum cohesion, internal friction angle, clear distance between main tunnels, and burial depth on the deformation of the main tunnels and ground surface were systematically analyzed. The results show that: 1) The tunnel at the launching end experienced two sudden deformations during the portal breaking stage, with the bending moment increasing sharply first and then decreasing slowly; the deformation at the receiving end increased linearly with the pipe jacking advance, and reached the peak synchronously with the bending moment at the moment of portal breaking. 2) A centrally symmetrical settlement trough was formed on the ground surface, with a maximum settlement value of 2.3 mm; the maximum vertical and horizontal deformations of the main tunnel were 1.7 mm and 1.4 mm, respectively. 3) The improvement of stratum strength can reduce ground surface settlement but increase the horizontal deformation of the tunnel; the increase of the clear distance between main tunnels leads to the expansion of the settlement trough width; the increase of burial depth reduces ground surface settlement while increases the horizontal deformation of the tunnel.

Authors

Institutions

Publication Details

Journal
PLoS ONE
Published
2026-10-15
DOI
https://doi.org/10.1371/journal.pone.0360916
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of construction response for mechanized construction of metro connecting passages

Xiaochen Liu, Cai Yi, Lingbing Yi, Lu Han et al.
PLoS ONE
Geotechnical Engineering and Analysis
article

Analysis of construction response for mechanized construction of metro connecting passages

Xiaochen Liu, Cai Yi, Lingbing Yi, Lu Han, Peng Zhang
article en

Abstract

To investigate the influence of mechanized pipe jacking construction for connecting passages in weathered granite strata on the settlement and deformation of left and right shield sections of metro tunnels and ground surface, this paper takes the pipe jacking project of No.1 connecting passage in a typical weathered granite stratum as the research background. Numerical analysis software was used to model and analyze the whole construction process of the connecting passage using the mechanized pipe jacking method. The accuracy of the numerical model was verified by comparison with field monitoring data. On this basis, the influence laws of stratum cohesion, internal friction angle, clear distance between main tunnels, and burial depth on the deformation of the main tunnels and ground surface were systematically analyzed. The results show that: 1) The tunnel at the launching end experienced two sudden deformations during the portal breaking stage, with the bending moment increasing sharply first and then decreasing slowly; the deformation at the receiving end increased linearly with the pipe jacking advance, and reached the peak synchronously with the bending moment at the moment of portal breaking. 2) A centrally symmetrical settlement trough was formed on the ground surface, with a maximum settlement value of 2.3 mm; the maximum vertical and horizontal deformations of the main tunnel were 1.7 mm and 1.4 mm, respectively. 3) The improvement of stratum strength can reduce ground surface settlement but increase the horizontal deformation of the tunnel; the increase of the clear distance between main tunnels leads to the expansion of the settlement trough width; the increase of burial depth reduces ground surface settlement while increases the horizontal deformation of the tunnel.

PLoS ONEVol. 21(10)
Shanghai Tunnel Engineering (China) (CN), Beijing Urban Construction Design & Development Group (China) (CN), China Communications Construction Company (China) (CN), China State Construction Engineering (China) (CN), Shanghai Construction Group (China) (CN), Huanghe Jiaotong University (CN), Southwest Jiaotong University (CN)
Industry, innovation and infrastructure, Sustainable cities and communities
Openalex Percentile: Top 13%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.