Economic Analysis of Electrode Boilers for District Energy Business: A Comparison of CHP-coupled and Independent Models

This study analyzes the economic feasibility of electrode boilers as Power-to-Heat in Korean district energy under two configurations. BM 1 couples an electrode boiler to a CHP plant, easing its heat burden and raising electricity sales margin; a breakeven price condition derived from generation cost, boiler efficiency, and reserve market participation was applied to actual KPX system marginal price data. BM 2 is a standalone electrode boiler with thermal storage, buffering the gap between heat production and demand; net present value was simulated from regional heat demand and daily prices, with sensitivity analysis on storage capacity. Under variable-cost criteria alone, breakeven was rarely achieved, but adequate reserve prices restore viability at average market prices. It peaked at a specific storage capacity relative to maximum regional heat load, with diminishing returns beyond. Reserve participation and storage sizing are thus decisive for viability and market design.

Authors

Publication Details

Journal
The Transactions of The Korean Institute of Electrical Engineers
Published
2026-10-15
DOI
https://doi.org/10.5370/kiee.2026.75.10.2428
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Economic Analysis of Electrode Boilers for District Energy Business: A Comparison of CHP-coupled and Independent Models

Taehyun Park, Haeseong Jeong, Jiyeoun Lee, Seonggeol Kim et al.
The Transactions of The Korean Institute of Electrical Engineers
Integrated Energy Systems Optimization
article

Economic Analysis of Electrode Boilers for District Energy Business: A Comparison of CHP-coupled and Independent Models

Taehyun Park, Haeseong Jeong, Jiyeoun Lee, Seonggeol Kim, Jongjun Lee, JungWon Yoon, Youngjae Ha
article en

Abstract

This study analyzes the economic feasibility of electrode boilers as Power-to-Heat in Korean district energy under two configurations. BM 1 couples an electrode boiler to a CHP plant, easing its heat burden and raising electricity sales margin; a breakeven price condition derived from generation cost, boiler efficiency, and reserve market participation was applied to actual KPX system marginal price data. BM 2 is a standalone electrode boiler with thermal storage, buffering the gap between heat production and demand; net present value was simulated from regional heat demand and daily prices, with sensitivity analysis on storage capacity. Under variable-cost criteria alone, breakeven was rarely achieved, but adequate reserve prices restore viability at average market prices. It peaked at a specific storage capacity relative to maximum regional heat load, with diminishing returns beyond. Reserve participation and storage sizing are thus decisive for viability and market design.

The Transactions of The Korean Institute of Electrical EngineersVol. 75(10)
Affordable and clean energy, Industry, innovation and infrastructure, Climate action
Openalex Percentile: Top 24%
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.