Long-Term Economic Analysis of an ESS Leasing-Based Virtual Power Plant Business Model for Participation in Renewable Energy Bidding Markets

Virtual power plant (VPP) operators participate in renewable energy bidding markets by forecasting renewable generation and submitting bids based on these forecasts. As allowable forecast-error ranges have recently been tightened to improve the reliability of renewable energy resources, VPP operators face increasing imbalance penalty (IBP) costs. Energy storage systems (ESSs) can mitigate IBP costs by storing surplus generation that is not cleared in the market and selling it later. However, the high upfront cost of ESSs entails considerable financial risk and may create a significant barrier to entry for VPP operators. Therefore, this study evaluates the long-term economic feasibility of an ESS leasing-based business model involving renewable energy generators, an ESS leasing provider, and a VPP operator participating in a renewable energy bidding market. A VPP operating revenue model incorporating metered energy payments, capacity payments, and IBPs was developed, and a one-year operational simulation was conducted. The resulting costs and benefits were subsequently evaluated over the project lifetime.

Authors

Publication Details

Journal
The Transactions of The Korean Institute of Electrical Engineers
Published
2026-10-15
DOI
https://doi.org/10.5370/kiee.2026.75.10.2803
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Long-Term Economic Analysis of an ESS Leasing-Based Virtual Power Plant Business Model for Participation in Renewable Energy Bidding Markets

Kyeong-Hwan Kim, Dae-sung Lee, Sung-Won Park, Geon-Woo Kim et al.
The Transactions of The Korean Institute of Electrical Engineers
Smart Grid Energy Management
article

Long-Term Economic Analysis of an ESS Leasing-Based Virtual Power Plant Business Model for Participation in Renewable Energy Bidding Markets

Kyeong-Hwan Kim, Dae-sung Lee, Sung-Won Park, Geon-Woo Kim, Sung-Yong Son
article en

Abstract

Virtual power plant (VPP) operators participate in renewable energy bidding markets by forecasting renewable generation and submitting bids based on these forecasts. As allowable forecast-error ranges have recently been tightened to improve the reliability of renewable energy resources, VPP operators face increasing imbalance penalty (IBP) costs. Energy storage systems (ESSs) can mitigate IBP costs by storing surplus generation that is not cleared in the market and selling it later. However, the high upfront cost of ESSs entails considerable financial risk and may create a significant barrier to entry for VPP operators. Therefore, this study evaluates the long-term economic feasibility of an ESS leasing-based business model involving renewable energy generators, an ESS leasing provider, and a VPP operator participating in a renewable energy bidding market. A VPP operating revenue model incorporating metered energy payments, capacity payments, and IBPs was developed, and a one-year operational simulation was conducted. The resulting costs and benefits were subsequently evaluated over the project lifetime.

The Transactions of The Korean Institute of Electrical EngineersVol. 75(10)
Affordable and clean energy, Industry, innovation and infrastructure, Climate action
Openalex Percentile: Top 24%
Smart Grid Energy Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.