Assessing current practices and critical success factors influencing BIM adoption in Sarawak’s construction industry

Purpose This study aims to facilitate the industry on their readiness for building information modelling (BIM) adoption by assessing current practices and critical success factors (CSFs) of BIM adoption in the Sarawak construction industry. Design/methodology/approach This paper used a quantitative approach using a questionnaire survey to assess the level of BIM adoption in the Sarawak construction industry by examining current BIM practices and CSF. A total of 345 responses were required, and 295 valid responses were obtained from construction industry players, resulting in a response rate of 85.5%. The data were analysed using descriptive analysis, specifically mean scores and ranking. The questionnaire comprised three sections: demographic information, current BIM practices and CSF of BIM. Findings The findings identify the highest and lowest-ranked factors for construction performance (CP) and CSF within the scope of this study. The highest-ranked CP and CSF represent the most influential elements contributing to project success in the Sarawak construction industry, while the lowest-ranked factors indicate areas with minimal impact or lower perceived importance. These results highlight priority areas for industry stakeholders to focus on, as well as aspects that may require further investigation or improvement in future studies. Research limitations/implications This study is limited to the construction industry in Sarawak, and the population size of contractors and developers was not considered in the research scope. Future studies should incorporate a broader geographical coverage across divisions and more categories of population size to enhance the reliability and generalisability of the results. Originality/value There is no study on the current practices and CSF of BIM in the Sarawak construction industry yet. The significance of this study is to close the research gap by producing and documenting both variables for Sarawak.

Authors

Institutions

Publication Details

Journal
Facilities
Published
2026-10-14
DOI
https://doi.org/10.1108/f-02-2026-0026
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing current practices and critical success factors influencing BIM adoption in Sarawak’s construction industry

Lin Wei Chin, Afzan Ahmad Zaini
Facilities
BIM and Construction Integration
article

Assessing current practices and critical success factors influencing BIM adoption in Sarawak’s construction industry

Lin Wei Chin, Afzan Ahmad Zaini
article en

Abstract

Purpose This study aims to facilitate the industry on their readiness for building information modelling (BIM) adoption by assessing current practices and critical success factors (CSFs) of BIM adoption in the Sarawak construction industry. Design/methodology/approach This paper used a quantitative approach using a questionnaire survey to assess the level of BIM adoption in the Sarawak construction industry by examining current BIM practices and CSF. A total of 345 responses were required, and 295 valid responses were obtained from construction industry players, resulting in a response rate of 85.5%. The data were analysed using descriptive analysis, specifically mean scores and ranking. The questionnaire comprised three sections: demographic information, current BIM practices and CSF of BIM. Findings The findings identify the highest and lowest-ranked factors for construction performance (CP) and CSF within the scope of this study. The highest-ranked CP and CSF represent the most influential elements contributing to project success in the Sarawak construction industry, while the lowest-ranked factors indicate areas with minimal impact or lower perceived importance. These results highlight priority areas for industry stakeholders to focus on, as well as aspects that may require further investigation or improvement in future studies. Research limitations/implications This study is limited to the construction industry in Sarawak, and the population size of contractors and developers was not considered in the research scope. Future studies should incorporate a broader geographical coverage across divisions and more categories of population size to enhance the reliability and generalisability of the results. Originality/value There is no study on the current practices and CSF of BIM in the Sarawak construction industry yet. The significance of this study is to close the research gap by producing and documenting both variables for Sarawak.

Facilities
Universiti Malaysia Sarawak (MY)
Industry, innovation and infrastructure, Sustainable cities and communities
Openalex Percentile: Top 16%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.