Operational Effects of Power-to-Electric Boiler Considering Flexible Operation of Nuclear Power Plants

This study evaluates the operational effects of power-to-electric boilers (P2eB) in the 2030 Korean power system, considering flexible nuclear operation. A reserve-constrained unit commitment model jointly optimizes the power and heat systems while representing nuclear output reduction, minimum-output holding, and recovery. P2eB capacity is varied from 0 to 10 GW under different nuclear operating and reserve-provision conditions. The results show that P2eB reduce operating costs, renewable energy curtailment, and nuclear output reduction by absorbing surplus electricity and replacing heat production from combined heat and power units and peak-load boilers. Cost reductions reach approximately KRW 7.0 billion under rated nuclear operation and KRW 5.5 billion under partial flexible operation, with primary reserve provision yielding the greatest benefit.

Authors

Publication Details

Journal
The Transactions of The Korean Institute of Electrical Engineers
Published
2026-10-15
DOI
https://doi.org/10.5370/kiee.2026.75.10.2373
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Operational Effects of Power-to-Electric Boiler Considering Flexible Operation of Nuclear Power Plants

Yu-Seok Lee, Yeong-Han Chun, Sang-Jin Ahn, Woo-Jung Kim
The Transactions of The Korean Institute of Electrical Engineers
Integrated Energy Systems Optimization
article

Operational Effects of Power-to-Electric Boiler Considering Flexible Operation of Nuclear Power Plants

Yu-Seok Lee, Yeong-Han Chun, Sang-Jin Ahn, Woo-Jung Kim
article en

Abstract

This study evaluates the operational effects of power-to-electric boilers (P2eB) in the 2030 Korean power system, considering flexible nuclear operation. A reserve-constrained unit commitment model jointly optimizes the power and heat systems while representing nuclear output reduction, minimum-output holding, and recovery. P2eB capacity is varied from 0 to 10 GW under different nuclear operating and reserve-provision conditions. The results show that P2eB reduce operating costs, renewable energy curtailment, and nuclear output reduction by absorbing surplus electricity and replacing heat production from combined heat and power units and peak-load boilers. Cost reductions reach approximately KRW 7.0 billion under rated nuclear operation and KRW 5.5 billion under partial flexible operation, with primary reserve provision yielding the greatest benefit.

The Transactions of The Korean Institute of Electrical EngineersVol. 75(10)
Affordable and clean energy, Industry, innovation and infrastructure, Climate action
Openalex Percentile: Top 24%
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.